UNPACKING & IDENTIFYING PARTS
Prior to assembling your New Portable Shelter, unpack all crates and
complete an inventory of all parts according to the following list and
diagrams
Should the shelter require relocation or disassembly for any reason, it is
strongly recommended that the structure and its cover are thoroughly
inspected prior to rebuilding
PERIODIC SHELTER INSPECTION
SHELTER RELOCATION
PLEASE BE
Safety
CONSCIOUS!
Common Sense is the knack of seeing things as they are, and doing things as they
ought to be done.
Harriet Beecher Stowe
As with all structures, periodic inspection of the cover and all structural
components is highly recommended. Tightening the cover and the
structure will prolong the life of your investment
Covering Your World