Shell newmotion Home Advanced Edition 7 Скачать руководство пользователя страница 16

INSTALLATIEHANDLEIDING – P16 

VERSION 0129NM02INT01 

INSTALLATION MANUAL – P16  | 

P16

EN

FR

07ANM20INT0

1

1.1 PRODUCT DESCRIPTION & 

INTENDED USE

Thank you for choosing a NewMotion Electric Vehicle 
(EV) Charge Point.

This charge point is intended to charge the batteries within 
EVs compatible with IEC-61851 MODE3 definition and 
requirements. Dedicated EV specific plugs will need to be 
utilised. No adaptors, conversion adaptors or extension 
sets for cables are allowed to be used. EVs and cables 
used with this charge point should always be undamaged 
and in their original state. 

1.2 SAFETY W CAUTION!

The electrical system must be voltage-free during the 
entire installation procedure. Failing to do so can lead to 
serious injury or even death. The installation procedure 
must be carried out by a trained installer who works in 
accordance with all relevant local laws and regulations. 
Do not install in potentially explosive atmospheres and/
or zones with high electromagnetic radiation and/or in 
flood-prone areas.

The charge point is connected to the electricity grid and 
even if the equipment is switched off, hazardous voltag-
es may be present at the input terminals. Always switch 
off the AC supply before starting any work on the charge 
point and/or its installation. Do not carry out any work 
in rainy conditions or when the humidity is above 95%. 
The safety guidelines are intended to ensure correct in-
stallation and usage. Any failure to comply with the valid 
safety guidelines or instructions provided in this manual 
may result in fire, electrocution or severe injury.

The charge point is a product in Safety Class I and is 
supplied with an earth terminal for protection purposes. 
The AC input clamps must be fitted with an uninterruptible 
earth for protection purposes. Ensure that the connection 
cables are fitted with fuses and circuit breakers. Never 
replace a protection component with another type. First 
check the full installation to determine if that component 
can be used with the existing installation components.

Before you switch on the charge point, check that the 
available power source matches the configuration set-
tings of the product, as described in this manual.

Tripping of the RCD could be caused by an earth fault 
or a defect relay. If, after resetting the RCD, the device 
cannot be activated or immediately trips again; please 
contact your installer.

1.3 LEGAL DISCLAIMER

This manual is created for you with care.  
We however do not guarantee that all information is 
complete, accurate and correct. 

If you find any unclarities or mistakes in this installation
manual, or if you have any feedback or suggestions in
general about this manual, please inform us at
[email protected] and men-
tion the document version in the subject.

Please check our website 

www.newmotion.com/fr_FR/assistance

 

for the latest version of this manual.

NewMotion strongly advises to have the product 
installed by certified professionals. How the product 
should be installed and used depends on local circum-
stances and local and national regulation, which are not 
mentioned in our manual. NewMotion is not responsible 
for any loss or damage whatsoever caused – including 
without limitation, any indirect, personal or consequen-
tial loss or damage – arising from or in connection with 
the use of this manual. Nor does NewMotion accept any 
liability for any such loss or damage arising out of your 
reliance on any information contained in this manual.

1.4 CHARGE POINT OPERATION

In case of an error or issue, please contact NewMotion 
for support.

1. INTRODUCTION

Содержание newmotion Home Advanced Edition 7

Страница 1: ...100 cm Home Advanced Edition 7 VERSION 07ANM20INT01 2020 MANUEL D INSTALLATION FR INSTRUCTION MANUAL EN...

Страница 2: ......

Страница 3: ...Table des mati res Table of contents Manuel d installation FR Pages 4 15 Instruction manual EN Pages 16 27 NewMotion Home Advanced Edition 7...

Страница 4: ...s pinces d entr e CA doivent tre quip es d une terre ininterrompue des fins de protection Assurez vous que les c bles de connexion sont quip s de fusibles et de disjoncteurs Ne remplacez jamais un l m...

Страница 5: ...nale DIN 912 taille 6 Pelle C ble d alimentation Clips de montage pour c ble DDR MCB Pour la configuration locale smartphone avec application d installation C ble UTP CAT5 ou CAT6 Outil de sertissage...

Страница 6: ...Interface utilisateur Identification Backoffice de communication Module de gestion dynamique de la puissance de communication 07A _ _ _ _ _ Home Advanced 7 phase unique 32A Home Advanced 7 3 7 kW mono...

Страница 7: ...Dimensions Poids Entr e requise Plage d humidit de fonctionnement Plage de temp rature de fonctionnement Certificats Cl ture des exigences de l armoire lectrique 55x25x30 mm 27 gr 5V DC 100mA 5 95 5...

Страница 8: ...ION 0129NM02INT01 MANUEL D INSTALLATION P8 P8 EN FR 07ANM20INT01 2 3 APER U DU PRODUIT 2 APER U DES PRODUITS Type 2S EV Prise de courant et couvercle Lecteur RFID tiquette d identification avec num ro...

Страница 9: ...ON P9 P9 EN FR 07ANM20INT01 2 APER U DES PRODUITS 2 4 1 APER U DES CONNEXIONS Port Ethernet Poteau de mise la terre Entr e de c ble de donn es UTP avec joint en caoutchouc Entr es pour les c bles lect...

Страница 10: ...01 MANUEL D INSTALLATION P10 P10 EN FR 07ANM20INT01 2 APER U DES PRODUITS 2 4 2 APER U DE L INSTALLATION DES ACCESSOIRES P1 Port pour la gestion dynamique de l nergie Entr e de c ble de donn es UTP av...

Страница 11: ...5mm Fil solide de 10 mm2 Fil de fer toronn de 6 mm2 avec embouts C ble PE le conducteur PEN n est pas autoris Electrode de mise la terre install e s par ment 100 ohms de r sistance la propagation 230...

Страница 12: ...s appropri s l paisseur du des c ble s et placez le s dans l ouverture de l entr e du c ble d alimentation Lubrifiez si n cessaire pour faciliter le passage du c ble d alimentation tape 2 Fixez le s...

Страница 13: ...rectement connect s l aide d un testeur de c ble r seau Si la LED du port P1 de la borne de recharge est bleue le module de gestion dynamique de l nergie fonctionne Si elle est rouge la cl de s curit...

Страница 14: ...rging by NewMotion demande de scanner un code QR 5 1 VERROUILLAGE DE C BLE Activez la fonction de verrouillage du c ble pour verrouiller en permanence le c ble de charge 5 2 R GLAGE DE LA PUISSANCE S...

Страница 15: ...disjoncteur m canique dans votre coffret lectrique attendez 15 secondes et rallumez le VOTRE BORNE DE RECHARGE EST IL MUNIE D UN VOYANT ROUGE CLIGNOTANT Si c est le cas cela signifie que vous utilise...

Страница 16: ...he AC input clamps must be fitted with an uninterruptible earth for protection purposes Ensure that the connection cables are fitted with fuses and circuit breakers Never replace a protection componen...

Страница 17: ...old separately DIN 912 HEX allen key Size 6 Shovel Power cable Cable mount clips RCD MCB For local configuration smartphone with Installer app UTP cable CAT5 or CAT6 RJ45 UTP cable crimp tool RJ45 con...

Страница 18: ...r interface Identification Communication backoffice Communication Dynamic Power Management module 07A _ _ _ _ _ Home Advanced 7 single phase 32A Home Advanced 7 3 7 kW single phase 16A Class I Type 2S...

Страница 19: ...IONS CONTINUED 2 PRODUCT OVERVIEW P1 DONGLE SPECIFICATIONS Stand by consumption Operating temperature range Operating humidity range Operating air pressure range Maximum mounting height socket Advised...

Страница 20: ...P20 VERSION 0129NM02INT01 INSTALLATION MANUAL P20 P20 EN FR 07ANM20INT01 2 3 OVERVIEW OF PRODUCT 2 PRODUCT OVERVIEW Type 2S EV Plug socket cover lid RFID Reader Identification label with serial numbe...

Страница 21: ...EHANDLEIDING P21 VERSION 0129NM02INT01 INSTALLATION MANUAL P21 P21 EN FR 07ANM20INT01 2 PRODUCT OVERVIEW 2 4 1 OVERVIEW OF CONNECTIONS Earthing pole Inlets for power cables Power cables clamps Phase 1...

Страница 22: ...2 VERSION 0129NM02INT01 INSTALLATION MANUAL P22 P22 EN FR 07ANM20INT01 2 PRODUCT OVERVIEW 2 4 2 OVERVIEW INSTALLING ACCESSORIES P1 Port for Dynamic Power Management UTP data cable inlet with rubber se...

Страница 23: ...nded wire with ferrules PE cable PEN conductor is not allowed Separately installed grounding electrode 100 Ohm spreading resistance 230V N 10 50Hz Cable grommets sizes Maximum cable terminal block TN...

Страница 24: ...Warning Keep charge point switched off during installation 4 4 DYNAMIC POWER MANAGEMENT MODULE The Dynamic Power Management Module package contains one Dynamic Power Management module one power adapt...

Страница 25: ...e P1 port the cable is not correctly connected 4 5 FINISHING UP Step 1 Check and make sure that the rubber seal of the casing is properly in place on the edge Step 2 Place the cover on the charge poin...

Страница 26: ...n which is included in the charge point package when the Installer App requests to scan a QR Code 5 1 CABLE LOCK Enable the cable lock feature to permanently lock the charge cable 5 2 POWER SETTING Se...

Страница 27: ...n your fuse box wait 15 seconds and turn it back on IS THERE A BLINKING RED LED LIGHT ON YOUR CHARGE POINT If so it means you are using a card which is not linked to the charge point by your installer...

Страница 28: ......

Отзывы: