SD-AS10
3 – 12
175
135
ASSEMBLY SEQUENCE
1. FIX ITEM 175 TO ITEM 135 THEN FIX ITEM 166
2. FIX ITEM 191 TO ITEM 109 THEN ITEM 176
166
3. FIX ITEM 177 TO ITEM 194
4. FIX ITEM 505 X 2 TO ROLLER SUB ASSY
179
NOTE :
194
1. AFTER FIX MAKESURE ALL GEAR & ROLLER CAN
191
O.K
ROTATE FREELY
2. ITEM 191 TO 109 INSERT FORCE MUST BE WITHIN
107
3 kg ~ 10 kg .
176
FIXING CAVITY
DIRECTION IS N.G
505
8
Содержание SD-AS10
Страница 24: ...SD AS10 3 9 ASSEMBLY SEQUENCE 1 FIX ITEM 148 157 TO ITEM 115 148 157 115 5 ...
Страница 45: ...SD AS10 3 30 120 ASSEMBLY SEQUENCE 1 FIX ITEM 158 TO ITEM 120 THEN FIX WITH ITEM 160 158 160 26 ...
Страница 49: ...SD AS10 3 34 ASSEMBLY SEQUENCE 127 1 FIX ITEM 127 TO MAIN CHASSIS ASSY 2 FIX ITEM 168 TO M C RESET ARM 168 30 ...
Страница 50: ...SD AS10 3 35 178 ASSEMBLY SEQUENCE 1 FIX ITEM 178 TO MAIN CHASSIS ASSY 31 ...
Страница 51: ...SD AS10 3 36 145 ASSEMBLY SEQUENCE 1 FIX ITEM 145 TO MECHA HOLDER ASSY SCREW HALF WAY ONLY TIGHTEN IT 32 508 ...
Страница 53: ...SD AS10 3 38 M E M O ...
Страница 75: ...SD AS10 5 4 6 6 ...
Страница 186: ... M E M O SD AS10 ...
Страница 187: ... M E M O SD AS10 ...