R939(W)
9 – 2
6) After that procedure, re-connect the power supply cord.
After checking the performance of the touch control panel,
1) Disconnect the power supply cord.
2) Open the door and block it open.
3) Re-connect the leads to the primary of the power transformer.
4) Re-install the outer case (cabinet).
5) Re-connect the power supply cord after the outer case is installed.
6) Run the oven and check all functions.
a) On some models, the power supply cord between the touch
control panel and the oven itself is so short that the two can't be
separated. For those models, check and repair all the controls
(sensor-related ones included) of the touch control panel while
keeping it connected to the oven.
b) On some models, the power supply cord between the touch
control panel and the oven proper is long enough that they may
be separated from each other. For those models, therefore, it is
possible to check and repair the controls of the touch control
panel while keeping it apart from the oven proper; in this case
you must short both ends of the door sensing switch (on PWB)
of the touch control panel with a jumper, which brings about an
operational state that is equivalent to the oven door being
closed. As for the sensor-related controls of the touch control
panel, checking them is possible if the dummy resistor(s) with
resistance equal to that of the controls are used.
2.
Servicing the touch control panel with power supply from an
external power source:
Disconnect the touch control panel completely from the oven
proper, and short both ends of the door sensing switch (on PWB) of
the touch control panel, which brings about an operational state
that is equivalent to the oven door being closed. Connect an exter-
nal power source to the power input terminal of the touch control
panel, then it is possible to check and repair the controls of the
touch control panel; it is also possible to check the sensor-related
controls of the touch control panel by using the dummy resistor(s).
3. Servicing Tools
Tools required to service the touch control panel assembly.
1) Soldering iron: 60W
(It is recommended to use a soldering iron with a grounding termi-
nal.)
2) Oscilloscope: Single beam, frequency range: DC - 10MHz type or
more advanced model.
3) Others: Hand tools
4. Other Precautions
1) Before turning on the power source of the control unit, remove the
aluminium foil applied for preventing static electricity.
2) Connect the connector of the key unit to the control unit being sure
that the lead wires are not twisted.
3) After aluminium foil is removed, be careful that abnormal voltage
due to static electricity etc. is not applied to the input or output ter-
minals.
4) Attach connectors, electrolytic capacitors, etc. to PWB, making
sure that all connections are tight.
5) Be sure to use specified components where high precision is
required.