26
R - 50 8 D K
R - 5 10 D K
R -51 0DW
DOOR REPLACEMENT
forth, and up and down. In and out play of the door
allowed by the upper and lower position of the latch hook
should be less than 0.5mm. The vertical position of the
latch hook should be adjusted so that the door sensing
switch and secondary interlock switch are activated with
the door closed. The horizontal position of the latch hook
should be adjusted so that the plunger of the monitor
switch is pressed with the door closed.
6. Secure the screws with washers firmly.
7. Check the operation of all switches. If each switch has
not activated with the door closed, loosen screw and
adjust the latch hook position.
After adjustment, check the following.
1. In and out play of door remains less than 0.5mm when in
the latched position. First check upper position of latch
hook, pushing and pulling upper portion of door toward
the oven face. Then check lower portion of the latch
hook, pushing and pulling lower portion of the door
toward the oven face. Both results (play in the door)
should be less than 0.5mm.
2. The door sensing switch and secondary interlock switch
interrupt the circuit before the door can be opened.
3. Monitor switch contacts close when door is opened.
4. Re-install outer case and check for microwave leakage
around door with an approved microwave survey meter.
(Refer to Microwave Measurement Procedure.)
Figure C-3. Latch Switch Adjustments
REMOVAL
1. Disconnect the power supply cord.
2. Push the open button and open the door slightly.
3. Insert a putty knife (thickness of about 0.5mm) into the
gap between the choke cover and door frame as shown
in Figure C-4 to free engaging parts.
4. Pry the choke cover by inserting a putty knife as shown
in Figure C-4.
5. Release choke cover from door panel.
6. Now choke cover is free.
7. Release two (2) pins of door panel from two (2) holes of
upper and lower oven hinges by lifting up.
8. Now, door panel with door frame is free from oven cavity.
Figure C-4. Door Disassembly
9. Release the door panel from twelve (12) tabs of door
frame.
10.Remove the door panel from the door frame.
11.Now, door panel with sealer film is free.
12.Tear sealer film from door panel.
13.Now, door panel is free.
14.Slide latch head upward and remove it from door frame
by releasing latch spring from door frame and latch head.
15.Now, latch head and latch spring are free.
16.Remove door screen from door frame
17.Now, door frame is free.
RE-INSTALL
1. Re-install door screen to door frame.
2. Re-install the latch spring to the latch head. Re-install the
latch spring to the door frame. Re-install latch head to
door frame.
3. Re-install door panel to door frame by fitting twelve (12)
tabs of door frame to twelve (12) holes of door panel.
4. Put sealer film on door panel. Refer to “Sealer Film”
about how to handle new one.
5. Catch two (2) pins of door panel on two (2) hole of upper
and lower oven hinges.
6. Re-install choke cover to door panel by pushing.
Note: After any service to the door;
(A) Make sure that door sensing switch and secondary
interlock switch are operating properly. (Refer to
chapter “Test Procedures”.).
(B) An approved microwave survey meter should be
used to assure compliance with proper microwave
radiation emission limitation standards.
After any service, make sure of the following :
1. Door latch heads smoothly catch latch hook through
latch holes and that latch head goes through center of
latch hole.
2. Deviation of door alignment from horizontal line of cavity
face plate is to be less than 1.0mm.
3. Door is positioned with its face pressed toward cavity
face plate.
4. Check for microwave leakage around door with an
approved microwave survey meter. (Refer to Microwave
Measurement Procedure.)
Door Sensing
Switch
Monitor Switch
Switch Lever
Secondary Interlock
Switch
Latch Heads
Door
Choke Cover
Door Frame
Putty Knife