                      Shark® 250 Meter Quickstart

Electro 

Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions

Electro 

Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions

Shark® 250 Meter Quickstart Guide

Mechanical Installation:

Electrical Installation: 

Select diagram for your application.

NOTE: 

Other wiring configurations are available. See the full User Manual on the enclosed CD.

DIN mounting 
bracket 

Top mounting  
bracket groove 

Bottom  
mounting 
b

k

DIN Mounting brackets

Remove (unscrew) ANSI studs 
for DIN installation

DIN Installation

92mm Square
     form

ANSI Installation

      
        ANSI Studs

4.0” Round form

lc

HI

LO

lb

HI

LO

la

HI

LO

Earth Ground

L(+)

Power 
Supply
Connection

N(-)

L(+)

GND

N(-)

Vref

Va

Vb

Vc

LINE

LOAD

CT 
Shorting
Block

 FUSES
3 x 0.1A

 FUSE

3A

C

C

B

B

A

A

N

N

lc

HI

LO

lb

HI

LO

la

HI

LO

Earth Ground

Earth Ground

L(+)

Power 
Supply
Connection

N(-)

L(+)

GND

N(-)

Vref

Va

Vb

Vc

LINE

LOAD

CT 
Shorting
Block

 FUSES
3 x 0.1A

 FUSE

3A

C

C

B

B

A

A

N

N

lc

HI

LO

lb

HI

LO

la

HI

LO

Earth Ground

Earth Ground

L(+)

Power 
Supply
Connection

N(-)

L(+)

GND

N(-)

Vref

Va

Vb

Vc

LINE

LOAD

CT 
Shorting
Block

 FUSES
2 x 0.1A

 FUSE

3A

C

C

B

B

A

A

WYE direct, 3 
phase, 4 wire

Delta direct, 3 
phase, 3 wire

lc

HI

LO

lb

HI

LO

la

HI

LO

Earth Ground

L(+)

Power 
Supply
Connection

N(-)

L(+)

GND

N(-)

Vref

Va

Vb

Vc

LINE

LOAD

CT 
Shorting
Block

 FUSES
3 x 0.1A

 FUSE

3A

C

C

B

B

A

A

 

NOTE: 

Do not overtighten nuts.

 

The maximum installation torque is 0.4 Newton-Meter.

WYE with PTs, 
3 phase, 4 wire

Delta with PTs, 3 
phase, 3 wire

Содержание 250

Страница 1: ...orm lc HI LO lb HI LO la HI LO Earth Ground L Power Supply Connection N L GND N Vref Va Vb Vc LINE LOAD CT Shorting Block FUSES 3 x 0 1A FUSE 3A C C B B A A N N lc HI LO lb HI LO la HI LO Earth Ground Earth Ground L Power Supply Connection N L GND N Vref Va Vb Vc LINE LOAD CT Shorting Block FUSES 3 x 0 1A FUSE 3A C C B B A A N N lc HI LO lb HI LO la HI LO Earth Ground Earth Ground L Power Supply C...

Страница 2: ... Amps Set the Ct n value for 2000 NOTE Ct n is dictated by primary current Ct d is secondary current 6 Press the ENTER button to go to the PT numerator setting screen Pt n The current PT numerator is shown in the second line To change the setting press the DOWN ARROW until the value you want is displayed Then press the RIGHT ARROW to move to the next digit Repeat until the setting is done 7 Press ...

Страница 3: ...s the ENTER button For additional programming instructions for the faceplate buttons see Chapter 2 in the Shark 250 250T Meter Installation and Operation Manual on the enclosed CD and on EIG s website www electroind com Connect to the Meter through the USB Port The Shark 250 meter has a standard USB port that makes connection between the meter and a laptop PC very simple Follow these steps 1 Conne...

Страница 4: ...k Connect 5 The Device Status screen opens displaying information about the meter 6 Click OK to close the Device Status screen and then click the Profile icon in the Icon Bar 7 The meter s Device Profile screen opens giving you access to the programmable settings for the meter NOTE A few basic settings are explained here Refer to the Shark 250 Meter Installation and Opera tion Manual and the Commu...

Страница 5: ...items in the list to redisplay this screen a CT Ratio enter Primary CT Numerator 1 9999 Secondary CT Denominator 5 or 1 Amp b PT Ratio enter Primary PT Numerator 1 9999 Secondary PT Denominator 1 9999 Example Settings For a CT of 2000 5 A set the following CT Ratios in the entry fields CT Numerator Primary 2000 CT Denominator Secondary 5 The Current Full Scale field will read 2000 For a system tha...

Страница 6: ...eld to configure when the meter will start reading values above 0 voltage e Total Demand Distortion TDD Setting This setting of the Device Profile allows you to set the maximum value for current which is used for the TDD Total Demand Distortion calculation TDD is an index used to measure harmonics In this field enter the maximum load current for TDD To disable TDD enter 0 in the field f CT Reversa...

Страница 7: ...ore responding to queries Parity Odd Even or None Program Meter Time The meter is preset to Eastern time To change the meter time 1 From the Main screen s Title bar click Tools Set Device Time 2 You can either enter the time in the Time fields or click Use PC Time to set the time using your PC s time 3 Click Send NOTE The meter offers multiple Time Synchronization methods See Chapter 28 Section 28...

Страница 8: ...me is used to name the log databases when logs are downloaded MPORTANT When you have made changes to the meter s Device Profile click Update Device at the top left of the Device Profile screen s Icon Bar to send the new settings to the meter The meter will reboot and then you can reconnect to it Shark is a registered trademark of Electro Industries GaugeTech The distinctive shape style and overall...