                      Shark® 200 Meter Quickstart

Mechanical Installation

Electrical Installation: 

Select diagram for your application.

NOTE: 

Other wiring configurations are available. See the Shark 200 meter User Manual (see page QS-

1 for the download link).

WYE direct, 3 
phase, 4 wire

Delta direct, 3 
phase, 3 wire

 

NOTE: 

Do not overtighten nuts.

 

The maximum installation torque is 0.4 Newton-Meter.

WYE with PTs, 
3 phase, 4 wire

Delta with PTs, 3 
phase, 3 wire

Содержание 200

Страница 1: ...tion wiring and programming instructions For additional meter oper ation and programming information refer to your meter s Installation and Operation Manual and the Communicator PQATM MeterManagerPQATM and EnergyPQA comTM Software User Manual on EIG s website User Manual https www electroind com products shark 200 power and energy meter From the webpage click Technical Documents User Manual Softwa...

Страница 2: ... application NOTE Other wiring configurations are available See the Shark 200 meter User Manual see page QS 1 for the download link WYE direct 3 phase 4 wire Delta direct 3 phase 3 wire NOTE Do not overtighten nuts The maximum installation torque is 0 4 Newton Meter WYE with PTs 3 phase 4 wire Delta with PTs 3 phase 3 wire ...

Страница 3: ...This setting is display only it can t be changed 6 Press the ENTER button to go to the CT Scaling setting screen CT S The current Scaling is shown in the second line Press the DOWN ARROW to choose another value You can choose 1 10 or 100 7 Press the ENTER button to go to the PT numerator setting screen Pt n The current PT numerator is shown in the second line To change the setting press the DOWN A...

Страница 4: ... go to the meter Protocol setting screen Prot The meter s current Protocol is shown in the second and third lines Press the DOWN ARROW to choose another communication Protocol You can choose Mod rtU Modbus RTU choose this for RS485 connection Mod ASCI Modbus ASCII or dnp DNP 3 0 IMPORTANT If you are using the Ethernet option do not change any settings leave the protocol as Mod rtU 14 Press the ENT...

Страница 5: ... value as 1000 For additional programming instructions for the faceplate buttons see Chapter 6 in the Shark 200 200T Meter Installation and Operation Manual Connect to the Meter through the RS485 Port The Shark 200 meter has a stan dard RS485 port that makes connec tion between the meter and a laptop PC very simple The Shark 200 meter s RS485 port uses standard 2 wire half duplex architecture Fact...

Страница 6: ...atorPQATM software see page QS 1 for the download link 3 Click Connect in the Icon Bar 4 You will see the Connect screen Make sure your settings match the ones shown on the right use pull down menus 5 Click Connect The Device Status screen confirms the connection Click OK to close the Device Status screen 6 Click the Profile button on the Icon bar 7 The Device Profile screen opens The Tree menu on...

Страница 7: ... Primary and Secondary Voltage in Full Scale NOT Ratios NOTE You can also enter the Ratios for CT PT Numerator and Denominator and click the Update CT Update PT buttons to let the software calculate the Numerator Denominator and Multiplier for you You can then empty the Ratio fields and click the Update Ratio buttons to confirm the calculated set tings you will see the same ratios you initially en...

Страница 8: ...vice Profile screen click General Settings System Settings 2 Input a new meter designation into the field Note that it is important to name each meter individually since the meter name is used to name the log databases when logs are downloaded See Chapter 8 in the software manual for an explanation of the other settings in this screen IMPORTANT When you have made changes to the meter s Device Prof...

Отзывы: