Doc
#
E145704 V.1.10
QS - 1
Shark® 100T Quickstart
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Shark® 100T Quickstart Guide
Mechanical Installation
Installation Steps:
Slide top of groove of meter onto DIN Rail. Press gently until the meter clicks into place. If
mounting with DIN Rail provided, use Black Rubber Stoppers (also provided) shown above.
To remove meter, pull down on Release clip
.
Electrical Installation:
Select diagram for your application
.
NOTE:
Other wiring configurations are available. See the full Manual on the enclosed CD.
5.02”
[12.75cm]
3.25”
[8.26cm]
Ic Ib Ia
HI HI HI
LO
LO
LO
3.52”
[ 8.90cm]
0.62”
[1.61cm]
[12.10cm]
4.78"
[2.31cm]
0.91"
4.16”
[10.60cm]
DIN Installation
Release clip
100T
Dimensions
DIN Rail with black
rubber stoppers
lc
HI
LO
lb
HI
LO
la
HI
LO
Earth Ground
L(+)
Power
Supply
Connection
N(-)
L(+)
GND
N(-)
Vref
Va
Vb
Vc
LINE
LOAD
CT
Shorting
Block
FUSES
3 x 0.1A
FUSE
3A
C
C
B
B
A
A
N
N
lc
HI
LO
lb
HI
LO
la
HI
LO
Earth Ground
Earth Ground
L(+)
Power
Supply
Connection
N(-)
L(+)
GND
N(-)
Vref
Va
Vb
Vc
LINE
LOAD
CT
Shorting
Block
FUSES
3 x 0.1A
FUSE
3A
C
C
B
B
A
A
N
N
lc
HI
LO
lb
HI
LO
la
HI
LO
Earth Ground
Earth Ground
L(+)
Power
Supply
Connection
N(-)
L(+)
GND
N(-)
Vref
Va
Vb
Vc
LINE
LOAD
CT
Shorting
Block
FUSES
2 x 0.1A
FUSE
3A
C
C
B
B
A
A
WYE direct, 3
phase, 4 wire
Delta direct, 3
phase, 3 wire
lc
HI
LO
lb
HI
LO
la
HI
LO
Earth Ground
L(+)
Power
Supply
Connection
N(-)
L(+)
GND
N(-)
Vref
Va
Vb
Vc
LINE
LOAD
CT
Shorting
Block
FUSES
3 x 0.1A
FUSE
3A
C
C
B
B
A
A
WYE with PTs,
3 phase, 4 wire
Delta with PTs, 3
phase, 3 wire