background image

     

Doc

#    

E145704   V.1.10     

          

             QS - 1

                          Shark® 100T Quickstart

Electro 

Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions

Electro 

Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions

Shark® 100T Quickstart Guide

Mechanical Installation

Installation Steps: 

Slide top of groove of meter onto DIN Rail. Press gently until the meter clicks into place. If 

mounting with DIN Rail provided, use Black Rubber Stoppers (also provided) shown above.  
To remove meter, pull down on Release clip

Electrical Installation: 

Select diagram for your application

.

NOTE:

 Other wiring configurations are available. See the full Manual on the enclosed CD.

5.02”

 

 [12.75cm] 

 

3.25” 

   [8.26cm]

Ic       Ib       Ia 

HI HI HI 

LO 

LO 

LO 

3.52”

 [ 8.90cm]

0.62”
[1.61cm]

   [12.10cm]

4.78"

   [2.31cm]

0.91" 

4.16”

    [10.60cm]

DIN Installation

                                                 

Release clip

100T

Dimensions

   

DIN Rail with black

     rubber stoppers

lc

HI

LO

lb

HI

LO

la

HI

LO

Earth Ground

L(+)

Power 
Supply
Connection

N(-)

L(+)

GND

N(-)

Vref

Va

Vb

Vc

LINE

LOAD

CT 
Shorting
Block

 FUSES
3 x 0.1A

 FUSE

3A

C

C

B

B

A

A

N

N

lc

HI

LO

lb

HI

LO

la

HI

LO

Earth Ground

Earth Ground

L(+)

Power 
Supply
Connection

N(-)

L(+)

GND

N(-)

Vref

Va

Vb

Vc

LINE

LOAD

CT 
Shorting
Block

 FUSES
3 x 0.1A

 FUSE

3A

C

C

B

B

A

A

N

N

lc

HI

LO

lb

HI

LO

la

HI

LO

Earth Ground

Earth Ground

L(+)

Power 
Supply
Connection

N(-)

L(+)

GND

N(-)

Vref

Va

Vb

Vc

LINE

LOAD

CT 
Shorting
Block

 FUSES
2 x 0.1A

 FUSE

3A

C

C

B

B

A

A

WYE direct, 3 
phase, 4 wire

Delta direct, 3 
phase, 3 wire

lc

HI

LO

lb

HI

LO

la

HI

LO

Earth Ground

L(+)

Power 
Supply
Connection

N(-)

L(+)

GND

N(-)

Vref

Va

Vb

Vc

LINE

LOAD

CT 
Shorting
Block

 FUSES
3 x 0.1A

 FUSE

3A

C

C

B

B

A

A

WYE with PTs, 
3 phase, 4 wire

Delta with PTs, 3 
phase, 3 wire

Содержание 100T

Страница 1: ...O 3 52 8 90cm 0 62 1 61cm 12 10cm 4 78 2 31cm 0 91 4 16 10 60cm DIN Installation Release clip 100T Dimensions DIN Rail with black rubber stoppers lc HI LO lb HI LO la HI LO Earth Ground L Power Supply Connection N L GND N Vref Va Vb Vc LINE LOAD CT Shorting Block FUSES 3 x 0 1A FUSE 3A C C B B A A N N lc HI LO lb HI LO la HI LO Earth Ground Earth Ground L Power Supply Connection N L GND N Vref Va ...

Страница 2: ...lick Connect on the tool bar The Connect screen opens Make sure your settings match these use pull down windows 3 Click Connect The Device Status screen confirms the connection 4 Click OK Communicator EXT s Main screen opens Configuration Steps 5 Click the Profile button on the tool bar The Device Profile screen opens 6 Click the Communication tab and select settings based on your application RS48...

Страница 3: ... Device 8 When changes are complete click the Update button to send a new profile to the Shark 100T meter 9 Click Cancel to Exit the profile or click other tabs to update other screens 10 Use Communicator EXT to communicate with the device and perform required tasks NOTE For further details and additional programming screens Password Limits Energy and Display refer to the Shark User s Manual Commu...

Страница 4: ...teway IP Address 192 168 000 001 Set Netmask N for default Y Y 7 Continue setting up parameters as needed After you finish your modifications press the S key on the keyboard This saves the new values and causes a Reset in the Ethernet card CAUTION DO NOT PRESS D as it will overwrite any changes and save the default values Connection Steps 1 Open Communicator EXT software and click Connect You will...

Отзывы: