background image

SCM-MFD-LC-KIT 

OPERATION MANUAL

Shadow-Caster

®

 LED Lighting  |  2060 Calumet Street.  |  Clearwater, FL 33765

p:

 1+ 727.474.2877   

e:

 [email protected]   

w:

 shadow-caster.com

12

SCM-MZ-LC NOT LIGHTING UP

When power is first applied to the lighting controller, the 

box will flash blue very briefly.
Once it receives a valid control input from a connected 

controller it will stay blue continuously. If it is not light-

ing up please double check for correct orientation and 

reseat the SC-NET cable. 

SHADOW-NET

®

 LIGHTS WILL OCCASIONALLY 

LOCK UP AND STOP RECEIVING MESSAGES

This indicates that there is a noise issue on the 

Shadow-NET

®

 communication lines. Typically this is 

caused by insufficient gauge wire feeding one or more 

Shadow-NET

®

 connected lights.

MY SHADOW-NET

®

 LIGHTS STAY ON

If the connected Shadow-NET

®

 lights are not turning 

off at initial power up then there is a challenge with the 

Shadow-NET

®

 connection.

Check the orange and yellow wire connections are not 

reversed and are fully connected.

TROUBLESHOOTING

MFD CONNECTION TROUBLESHOOTING

MY SYSTEM IS NOT CONNECTING:

Remove 4 screws on top of SCM-MFD-BRIDGE. Verify 

that the blue power light is on. This indicates a bad con-

nection on the 4 pin cable from the lighting controller
Verify that the red and green communication lights 

are coming on and blinking. This will verify that the 

Ethernet connection is good, and communication is 

established.

MUSIC SYNC NOT WORKING

Verify that an appropriate 3.5mm stereo jack is being 

used and that there is a usable signal.
If a separate output zone is used, verify that the output 

is enabled and the output is set to a usable volume.
It is not recommended to use a subwoofer output, as 

certain sync modes require the full audio range. 

MY SYSTEM HAS A "BOOT LOADER ERROR" 

This is typically a problem with multi-screen installation 

and indicates that a POE isolator is needed.

Содержание SCM-MFD-LC-KIT

Страница 1: ...W W W S H A D O W C A S T E R C O M INSTALLATION OPERATION MANUAL SCM MFD LC KIT MFD LIGHTING CONTROLLER KIT...

Страница 2: ...LC KIT TYPICAL WIRING DIAGRAM INITIALONBOARDINGSTEPS SHADOW CASTER LIGHTINGHOMESCREEN CONFIGURING ZONES USINGSCENES CONFIGURING PROGRAMS MUSIC SYNC CONFIGURATION CONNECTING THE SCM MFD BRIDGE INITIAL...

Страница 3: ...a white label inside the housing of the SCM MZ LC My Serial Number COMPATIBILITY OPTIONS Manufacturer Optional IP67 Shadow Caster Cable Required Cable from Manufacturer SCM MFD Cable Garmin PN 010 10...

Страница 4: ...of digital commands to other devices on the Shadow NET Bus orange and yellow wires The SCM MFD BRIDGE provides a control interface to the Multi Zone Lighting Controller through an Ethernet connected M...

Страница 5: ...of your chosen MFD as shown here Once selected press NEXT button to confirm 5 Designed Manufactured in Clearwater FL 2021 Shadow Caster LED Lighting All Rights Reserved 4 Select the number of lighting...

Страница 6: ...EXT button to confirm 6 Please make sure that all of the lighting devices on the network are powered and connected The system will go through and identify everything that is connected Once selected pr...

Страница 7: ...CBM is short for Red Yellow Green Cyan Blue Magenta CONFIGURING ZONES In the zone control box there are two buttons Pressing the top button reveals a drop down selection with three options turn the zo...

Страница 8: ...a scene button to delete it Note Long press functions are not supported in all Multi Function Displays MFDs UPDATING SCENES Simply save over a scene name to update it SAVING A SCENE Once all lighting...

Страница 9: ...c The lights should now be changing in sync with the music input SCM MFD LC KIT OPERATION MANUAL 9 Designed Manufactured in Clearwater FL 2021 Shadow Caster LED Lighting All Rights Reserved CONNECTING...

Страница 10: ...Music Sync Inputs SCM MFD BRIDGE INSTALLATION Central mounting locations under the helm areas or in the bilges are acceptable 1 Orient the cable glands facing down or to the side so that they do not c...

Страница 11: ...one 2 and Spreader Lights respond to Zone 3 OPTIONAL PARTS SCM ZC REMOTE Additional Remote Control SCM SCNET 01 1meter Cable SCM SCNET 02 2 meter Cable SCM SCNET 04 4 meter Cable SCM SCNET Y Y Cable A...

Страница 12: ...itial power up then there is a challenge with the Shadow NET connection Check the orange and yellow wire connections are not reversed and are fully connected TROUBLESHOOTING MFD CONNECTION TROUBLESHOO...

Страница 13: ...LED Lighting 2060 Calumet Street Clearwater FL 33765 p 1 727 474 2877 e info shadow caster com w shadow caster com Designed Manufactured in Clearwater FL 2021 Shadow Caster LED Lighting All Rights Re...

Отзывы: