background image

SCM-MFD-LC-KIT 

OPERATION MANUAL

11

Designed & Manufactured

in Clearwater, FL

© 2021 Shadow-Caster

®

 LED Lighting, All Rights Reserved

SHADOW-NET

®

 DEVICES

Connect Shadow-NET

®

 enabled devices to the orange 

and yellow Shadow-NET

®

 wires coming from the Multi-

Zone Lighting Controller.
As soon as the Multi-Zone Lighting Controller receives 

power, multiple channels of digital messages start 

broadcasting on these wires. These messages allow 

Shadow-NET

®

 enabled devices to be connected without 

a switch. Initially these commands are for attached 

lights to turn off. As soon as a command is given to the 

Multi-Zone Lighting Controller to go to a color, these 

attached devices will receive a message to go to the 

corresponding color and brightness.
Please note that different products are pre-programmed 

to respond to a certain channel. For example, 

Underwater Lights respond to Zone 1, Down Lights 

respond to Zone 2 and Spreader Lights respond to Zone 

3.

OPTIONAL PARTS

SCM-ZC-REMOTE Additional Remote Control

SCM-SCNET-01 1meter Cable

SCM-SCNET-02 2 meter Cable

SCM-SCNET-04 4 meter Cable

SCM-SCNET-Y Y Cable

ADDING ADDITIONAL REMOTES AND 

MULTI-FUNCTION DISPLAYS

Additional SCM-ZC-REMOTES can be added to your 

installation with our Y-cable and 1m, 2m & 4m extension 

cables. See Optional Parts section below for details.

SCM-MFD-BRIDGE

MFD

SCM-MZ-LC

SCM-ZC-REMOTE

CONNECTING STEREO INPUT FOR

STEREO MUSIC SYNC INPUT

Stereo

Amp

To 3.5mm 

Female Audio 

Jack  Input

RCA (Phono) 

Cables & Splitters

BEST PRACTICES FOR MITIGATING 

NOISE ISSUES

Noise interface is common in systems with RGB 

lighting controls and amplified stereo systems. The 

advanced circuitry in the lighting controller does 

everything possible to protect from this.
Utilizing installation best practices will further mitigate 

these issues.

1.

Make sure to supply ample gauge power and sepa-

rate distribution points from stereo power. 

2. 

Run RGB power wires as far as possible from the 

speaker feeds for the stereo. Run separate bundles 

where possible. 

Содержание SCM-MFD-LC-KIT

Страница 1: ...W W W S H A D O W C A S T E R C O M INSTALLATION OPERATION MANUAL SCM MFD LC KIT MFD LIGHTING CONTROLLER KIT...

Страница 2: ...LC KIT TYPICAL WIRING DIAGRAM INITIALONBOARDINGSTEPS SHADOW CASTER LIGHTINGHOMESCREEN CONFIGURING ZONES USINGSCENES CONFIGURING PROGRAMS MUSIC SYNC CONFIGURATION CONNECTING THE SCM MFD BRIDGE INITIAL...

Страница 3: ...a white label inside the housing of the SCM MZ LC My Serial Number COMPATIBILITY OPTIONS Manufacturer Optional IP67 Shadow Caster Cable Required Cable from Manufacturer SCM MFD Cable Garmin PN 010 10...

Страница 4: ...of digital commands to other devices on the Shadow NET Bus orange and yellow wires The SCM MFD BRIDGE provides a control interface to the Multi Zone Lighting Controller through an Ethernet connected M...

Страница 5: ...of your chosen MFD as shown here Once selected press NEXT button to confirm 5 Designed Manufactured in Clearwater FL 2021 Shadow Caster LED Lighting All Rights Reserved 4 Select the number of lighting...

Страница 6: ...EXT button to confirm 6 Please make sure that all of the lighting devices on the network are powered and connected The system will go through and identify everything that is connected Once selected pr...

Страница 7: ...CBM is short for Red Yellow Green Cyan Blue Magenta CONFIGURING ZONES In the zone control box there are two buttons Pressing the top button reveals a drop down selection with three options turn the zo...

Страница 8: ...a scene button to delete it Note Long press functions are not supported in all Multi Function Displays MFDs UPDATING SCENES Simply save over a scene name to update it SAVING A SCENE Once all lighting...

Страница 9: ...c The lights should now be changing in sync with the music input SCM MFD LC KIT OPERATION MANUAL 9 Designed Manufactured in Clearwater FL 2021 Shadow Caster LED Lighting All Rights Reserved CONNECTING...

Страница 10: ...Music Sync Inputs SCM MFD BRIDGE INSTALLATION Central mounting locations under the helm areas or in the bilges are acceptable 1 Orient the cable glands facing down or to the side so that they do not c...

Страница 11: ...one 2 and Spreader Lights respond to Zone 3 OPTIONAL PARTS SCM ZC REMOTE Additional Remote Control SCM SCNET 01 1meter Cable SCM SCNET 02 2 meter Cable SCM SCNET 04 4 meter Cable SCM SCNET Y Y Cable A...

Страница 12: ...itial power up then there is a challenge with the Shadow NET connection Check the orange and yellow wire connections are not reversed and are fully connected TROUBLESHOOTING MFD CONNECTION TROUBLESHOO...

Страница 13: ...LED Lighting 2060 Calumet Street Clearwater FL 33765 p 1 727 474 2877 e info shadow caster com w shadow caster com Designed Manufactured in Clearwater FL 2021 Shadow Caster LED Lighting All Rights Re...

Отзывы: