8
3
D I A G R A M & P A R T S L I S T
1. Upper Internal Stem 9. Boom
2. Acetal Ring (between Internal Stems) 10. Head Fitting
3. Lower Internal Stem 11. Spacer Buttons
4. Locator Screws 12. Lower Hub
5. Winder 13. Safety Pin
6. Handle 14. Strut
7. Mast 15. Arm
8. Elbow 16. Canopy
STEP 5:
1. Using at least a two-person team, lift the closed canopy structure and insert the head
fitting into the boom.
a. One person on the ladder to help guide the head
fitting into the boom.
b. One or more persons to lift the canopy structure up
and align the head fitting with the boom. Again, the
canopy must be closed during insertion. Lift canopy
structure from the bottom of its arms.
NOTE:
The head fitting and boom fit together very
tightly. It may require a firm shimmy or push to insert.
2. Once the canopy structure’s head fitting has been inserted into the boom, one person
must operate the winder. Another person should remain on the ladder.
NOTE: The following steps (2a and 2b) should be performed by both parties
simultaneously.
a. The person operating the winder should turn the handle clockwise approximately
90 times. Once the handle becomes resistant to turning, promptly stop. It is
crucial to stop turning at the first sign of resistance.
DO NOT force the winder,
DO NOT continue to turn
.
(Overturning the winder may cause damage.)
b. The person on the ladder should hold the head fitting in place and continue to
shimmy it into the boom until the holes in the boom align with the holes in the
head fitting.
3. Insert bolts back into the head fitting and tighten with allen
wrench to complete attaching the canopy structure to the
boom.
Note:
Do not use power drill. May cause
damage to umbrella.
Содержание GALAXY-35S
Страница 1: ......