PAGE 23
PAGE 22
ASSEMBLY INSTRUCTIONS
ASSEMBLY INSTRUCTIONS
Electromagnetic valve 2 (#3)
Electromagnetic valve 1
#21 G1/2”-16 Straight
#9 Cylinder Block for
tank
Step 7.
a.
There are two 8mm hoses (orange and blue). From Electro-
magnetic Valve 2 (#3) on control panel, connect with the two
adapters for #9 Cylinder Block for tank, as shown in the diagram
above: H2-C2 and H3-C3.
b.
Connect the orange hose (16mm) from Electromagnetic valve
1(#2) on control panel straight to #21 G1/2”-16, as illustrated in
the diagram: H4-C4.
Note: to release the hose, push the
plastic ring inward.
PSA Foam
Step 8.
Assemble the right bar,
the rear bar and legs using the
M6x12 mm bolts and M6 nuts,
followed by installing the PSA
foam to the funnel as shown.
Hardware:
8 x M6x12 mm Bolt
8 x M6 Nut
PSA Foam Roll
WWW.SGS-ENGINEERING.COM