
VACUUM LEAK DETECTOR
VLXE ..
31/10/2019
- 30 -
5.7.6 Double-walled pipe, connected in series
02 Stop
cock
03 Exhaust
18
Detonation flame arrester
20
Three-way valve, suction line
21
Three-way valve, measuring line
27
Liquid stop valve
43 Measuring
line
57 Test
valve
68 Suction
line
74 Connection
line
82
Nozzle for installation pump
88 Double-walled
pipe
95
Pressure compensation vessel
96 Node
point
Installation
88
27
18
18
82
02
02
0
< ..
.. < H
ma
x
V
V
ÜR 1
ÜR 2
68
27
95
43
20
21
Ex
Ex