SGB UVP 218 Скачать руководство пользователя страница 9

 

22/01/2019 

Overpressure/Vacuum pump ÜVP/VP 218

 

- 9 - 

 

Connections to overpressure pump ÜVP 218 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                           

Figure 3 

 

Connections to vacuum pump VP 218 

 
 
 
 
 
 

            

Condensate trap with  

                       integrated liquid stop 

 
 
 
 

                           

Monitoring chamber  

                        connection vacuum; 
                        4 mm inner width for hose 

 
 
 
 
 
 
 
 
                                                                           

Figure 4

 

Figures 

Connection to interstitial space vacu-
um; for hose 4 mm inner width 

Condensate trap with integrated liquid 
stop 

Connection to interstitial space; 
overpressure; for hose 6 mm inner width 

Pressure regulator overpressure 

Pressure gauge 

Содержание UVP 218

Страница 1: ...Documentation Overpressure Vacuum pump VP VP 218 Read the instructions before starting any work Issue 01 2019 Art no 605 642...

Страница 2: ...formation 3 1 1 Marking 1 2 Unpacking 1 3 Erection 1 4 Disposal 2 Safety 4 2 1 Intended use 2 2 Responsibility 2 3 Motor protection 3 Use 5 3 1 Installation 3 2 Switching on 4 Maintenance 6 5 Fault 7...

Страница 3: ...person and check whether the overpressure vacuum pump is complete and free of damage 1 3 Erection Always erect the pump with clearance of at least 50 cm to any obstruc tion which could obstruct the f...

Страница 4: ...uum pump if the mains cable is faulty or if the power connection is not established correctly Do not allow anyone to use the overpressure vacuum pump without hav ing received suitable training on use...

Страница 5: ...s equipped with a type CEE 7 plug connector If necessary have it replaced by specialist staff Always check whether the on off switch is in the 0 OFF position before you connect the plug connector fig...

Страница 6: ...According to 15 BetrSichV a plant in need of monitoring is only to be started after it has been subjected to a test before startup Furthermore recurring inspections according to 16 BetrSichV have to...

Страница 7: ...customer service department 1 1 The motor coil has burned through con tact a customer service agent 2 The cylinder head seal or valve is dam aged Stop the overpressure vacuum pump immediately and con...

Страница 8: ...rpressure Vacuum pump VP VP 218 22 01 2019 8 6 Figures On off switch Pressure gauge Shut off valve Figure 1 refers to VP 218 and VP 218 Motor circuit breaker Figure 2 refers to VP 218 and VP 218 Figur...

Страница 9: ...trap with integrated liquid stop Monitoring chamber connection vacuum 4 mm inner width for hose Figure 4 Figures Connection to interstitial space vacu um for hose 4 mm inner width Condensate trap with...

Страница 10: ...Machinery directive 2000 14 EC Noise emissions in the environment 2006 95 EC Low voltage directive 2004 108 EC EMC directive EN1012 1 Compressors and vacuum pumps Safety requirements Part 1 Air compre...

Страница 11: ..._____________________________________________________________________________ ______________________________________________________________________________________ ___________________________________...

Страница 12: ...Overpressure Vacuum pump VP VP 218 22 01 2019 12 Text Text Imprint SGB GmbH Hofstr 10 57076 Siegen Germany Phone 49 271 48964 0 E mail sgb sgb de Web www sgb de SGB GmbH 01 2019...

Отзывы: