![SG Technologies SGT-3DPEG Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/sg-technologies/sgt-3dpeg/sgt-3dpeg_owners-manual_1251019007.webp)
SGT-3DPEG
Owner's Manual
5
PL1
PL2
PL3
PL4
5-4. Attach the head to the neck while aligning the bolt with the locator pin on the head and
tighten the bolt.
Head
Neck
Locator Pin
5-5. Align all the strings to the right positions on the bridge and the nut.
This completes the assembly.
Nut
Bridge
6
Tuning
Connect a guitar tuner (cable connection type) to the guitar and turn the volume pod to
the maximum position.
Note: Tuning order should be ;
5(A), 4(D), 3(G), 2(B) 1(E) and 6(E)
6-1.
Start with 5(A) string. At this stage, the tail piece is at the parallel line 2 (PL2). Turn the master
knob to move the tail piece to PL4. It is better to use both hands to turn the master knobs.