background image

- 7 -

122.6006.9

3

START-UP

3.1

Vacuum Check

The ejector, its water supply and solution lines, must be properly installed and checked before operating
the vacuum regulator. Unless the ejector is creating a vacuum, the vacuum regulator will not work.

3.1.1

Disconnect the vacuum tubing from the ejector.

3.1.2

Open the ejector water supply valve. The ejector should now be in operation and creating a
vacuum.

3.1.3

Put your finger on the vacuum connector opening and feel the vacuum. There should be no
doubt that a vacuum exists. If there is no vacuum, be certain the supply pressure is sufficient
and the nozzle or piping is not plugged. Correct the condition and obtain proper vacuum before
proceeding with vacuum regulator operation. (Reference vacuum regulator instruction manual)

3.1.4

Reconnect the vacuum tubing to the ejector. Leave the ejector running.

Содержание ADVANCE 200 Series

Страница 1: ...1 122 6006 9 Instruction Manual O Ring Ejector Chlorine Sulfur Dioxide to 500 PPD 10 kg h 100 PPD 2 kg h Maximum 250 PPD 5 kg h Maximum 500 PPD 10 kg h Maximum...

Страница 2: ...on to instruction operating manuals all instructions given on labels or attached tags should be followed Regardless of these efforts it is not possible to eliminate all hazards from the equipment or f...

Страница 3: ...ng 6 2 5 Vacuum Connections 6 3 START UP 7 3 1 Vacuum Check 7 4 SHUTDOWN 8 5 SERVICE 9 5 1 Nozzle Cleaning 9 5 2 O Ring Replacement 9 5 3 Diaphragm Replacement 10 5 4 Functional Test 10 5 5 Recommende...

Страница 4: ...ray is desired modify by cutting off the closed end b The ejector nozzle and check valve assembly may be located near the vacuum regulator A wall mounting bracket is available for field assembly and t...

Страница 5: ...d in a pipe the ejector diffuser should not be installed in the top of the pipe where gas may discharge and collect in an empty area of the pipe Diffuser penetration into the pipe should not exceed 1...

Страница 6: ...e Then for each 1 psig 0 07 bar of back pressure above zero the supply pressure must be increased about 2 to 3 psig 0 1 to 0 2 bar above 25 psig 2 bar A back pressure of 10 psig 0 7 bar would therefor...

Страница 7: ...r supply valve The ejector should now be in operation and creating a vacuum 3 1 3 Put your finger on the vacuum connector opening and feel the vacuum There should be no doubt that a vacuum exists If t...

Страница 8: ...anel s is are not to be used to shut off the gas flow The float in the gas flowmeter s should drop to the bottom of the flow meter indicating zero no gas feed 2 Continue the flow of water through the...

Страница 9: ...damage the plastic For 250 500 PPD 5 10 kg h ejectors remove the two 2 screws and loosen the flange to remove the nozzle NOTE Nozzle plugging can be caused by foreign material pipe scale stone dirt a...

Страница 10: ...onnect vacuum tubing to vacuum regulator 5 42 Turn on water supply 5 4 3 Verify vacuum at ejector 5 4 4 Turn water supply off for approximately 5 minutes If ejector is assembled properly no water will...

Страница 11: ...11 122 6006 9 Figure 2 100 PPD 2 kg h Ejector...

Страница 12: ...122 6006 9 12 Figure 3 250 PPD 5 kg h Ejector...

Страница 13: ...13 122 6006 9 Figure 4 500 PPD 10 kg h Ejector...

Страница 14: ...e p O c d n a b t c e r r o c e n i l n o i t u l o s n a e l c n o i t i d n o c e r u s s e r p k c a b r o t c e j e o t e r u s s e r p e s a e r c n I d t a o r h t r o d n a e l z z o n n a e l...