background image

122.6006.9

- 4 -

1

INTRODUCTION

1.1

General

The ADVANCE

®

 ejectors are expertly engineered and carefully tested to assure yearsof satisfactory

operation. They are constructed of the finest materials available for gas service. Correct installation and
proper care will ensure best operation. Read instructions carefully and save for future reference.

This instruction manual only covers our standard O-Ring ejector (Reference 122.3001). If another ejector
is used, reference one of the following:

Diaframless -122.4001, 122.3011.
Anti-siphon -122.3013 , 122.3012.
Variable Orifice - 122.3010 and 122.6050.

NOTE: The Series 200 O-Ring ejectors are designed for use with Series 200 gas feeders.

1.2

Warranty

See Bulletin 005.9001 for the ADVANCE

®

 equipment warranty.

1.3

Specifications

1.3.1

Gas Flow

Different inlet nozzle and diffuser combinations are available for the ejectors. Your particular combination
was chosen for your application.

a.

A universal diffuser can be used four different ways; spray diffuser, open-end diffuser,
3/4" threaded connection, or 1" hose connection. Choose the type suited for the installation
(spray is recommended for good mixing). If other than spray is desired, modify by cutting off
the closed end.

b.

The ejector (nozzle and check valve assembly) may be located near the vacuum regulator. A
wall mounting bracket is available for field assembly, and the universal diffuser can be modified
for a pipe or hose connection.

c.

The entire diffuser-ejector assembly may be submersed in an open channel or tank.

d.

Diffuser tubes with corporation stops can be supplied for either close-coupled or remote
ejectors.

e.

Corporation stops are recommended for high pressure pipeline applications and perforated pipe
diffusers are recommended for good mixing in open tanks or channels.

1.3.2

Back Pressure

Maximum back pressure at the point of application is 19 psig (1.3 bar). High pressure systems
20 to 140 psig (1.4 to 10 bar) can be accommodated with a high pressure ejector. Consult
factory if higher than 140 psig (10 bar) back pressures are required.

y

t

i

c

a

p

a

C

e

z

i

S

g

n

i

b

u

T

m

u

u

c

a

V

e

l

z

z

o

N

t

e

l

n

I

r

e

s

u

f

f

i

D

t

e

l

t

u

O

D

P

P

0

0

1

)

h

/

g

k

2

(

"

8

/

3

"

2

/

1

"

8

/

5

l

a

s

r

e

v

i

n

u

/

e

s

o

h

"

1

d

a

e

r

h

t

"

4

/

3

e

l

a

m

T

P

N

"

4

/

3

-

l

a

s

r

e

v

i

n

U

r

o

,

d

n

e

-

n

e

p

o

r

o

y

a

r

p

s

,

d

a

e

r

h

t

e

s

o

h

"

4

/

3

,

e

s

o

h

"

1

D

P

P

0

5

2

)

h

/

g

k

5

(

"

2

/

1

"

8

/

5

d

a

e

r

h

t

"

4

/

1

1

e

s

o

h

"

2

/

1

1

d

a

e

r

h

t

"

4

/

1

1

e

s

o

h

"

2

/

1

1

D

P

P

0

0

5

)

h

/

g

k

0

1

(

"

8

/

5

d

a

e

r

h

t

"

4

/

1

1

e

s

o

h

"

2

/

1

1

d

a

e

r

h

t

"

4

/

1

1

e

s

o

h

"

2

/

1

1

Содержание ADVANCE 200 Series

Страница 1: ...1 122 6006 9 Instruction Manual O Ring Ejector Chlorine Sulfur Dioxide to 500 PPD 10 kg h 100 PPD 2 kg h Maximum 250 PPD 5 kg h Maximum 500 PPD 10 kg h Maximum...

Страница 2: ...on to instruction operating manuals all instructions given on labels or attached tags should be followed Regardless of these efforts it is not possible to eliminate all hazards from the equipment or f...

Страница 3: ...ng 6 2 5 Vacuum Connections 6 3 START UP 7 3 1 Vacuum Check 7 4 SHUTDOWN 8 5 SERVICE 9 5 1 Nozzle Cleaning 9 5 2 O Ring Replacement 9 5 3 Diaphragm Replacement 10 5 4 Functional Test 10 5 5 Recommende...

Страница 4: ...ray is desired modify by cutting off the closed end b The ejector nozzle and check valve assembly may be located near the vacuum regulator A wall mounting bracket is available for field assembly and t...

Страница 5: ...d in a pipe the ejector diffuser should not be installed in the top of the pipe where gas may discharge and collect in an empty area of the pipe Diffuser penetration into the pipe should not exceed 1...

Страница 6: ...e Then for each 1 psig 0 07 bar of back pressure above zero the supply pressure must be increased about 2 to 3 psig 0 1 to 0 2 bar above 25 psig 2 bar A back pressure of 10 psig 0 7 bar would therefor...

Страница 7: ...r supply valve The ejector should now be in operation and creating a vacuum 3 1 3 Put your finger on the vacuum connector opening and feel the vacuum There should be no doubt that a vacuum exists If t...

Страница 8: ...anel s is are not to be used to shut off the gas flow The float in the gas flowmeter s should drop to the bottom of the flow meter indicating zero no gas feed 2 Continue the flow of water through the...

Страница 9: ...damage the plastic For 250 500 PPD 5 10 kg h ejectors remove the two 2 screws and loosen the flange to remove the nozzle NOTE Nozzle plugging can be caused by foreign material pipe scale stone dirt a...

Страница 10: ...onnect vacuum tubing to vacuum regulator 5 42 Turn on water supply 5 4 3 Verify vacuum at ejector 5 4 4 Turn water supply off for approximately 5 minutes If ejector is assembled properly no water will...

Страница 11: ...11 122 6006 9 Figure 2 100 PPD 2 kg h Ejector...

Страница 12: ...122 6006 9 12 Figure 3 250 PPD 5 kg h Ejector...

Страница 13: ...13 122 6006 9 Figure 4 500 PPD 10 kg h Ejector...

Страница 14: ...e p O c d n a b t c e r r o c e n i l n o i t u l o s n a e l c n o i t i d n o c e r u s s e r p k c a b r o t c e j e o t e r u s s e r p e s a e r c n I d t a o r h t r o d n a e l z z o n n a e l...

Отзывы: