8
2.3.2. Wiring electrical box (Rough-In)
Wiring must be performed by a licensed Electrician according to local and state electrical
codes.
Use only the knockouts at the back of the rough in box. The front knockouts will be
inaccessible once the MRMS is installed. Strain relief tubing and wires, and seal box as
required.
Tripe gang electrical box rough wiring and plumbing
2.3.3. Wiring (Finish)
Rear view of the MRMS showing wiring connections