12
ENGLISH
Control elements
T
U
Z
W
(T) Carrying handle
(Z) Cable winding element
(W) Bolt reception
(U) locking bolt
2.
Vertical adjustment
For vertical adjustment, hold the light at the
carrying handle, pull the locking bolt and
adjust to the desired incline. The incline can
be adjusted in several steps.
ATTENTION! Risk of injury!
The locking bolt must be locking into the desired
position. That way, you avoid accidents and
injuries.
Operation
1.
Installation at operation with stand / mast
systems
Connect the floodlight with bolt reception
and the stand / mast. Before extending the
mast, unwind the connection line entirely.
Electrical connection
Connect the mains plug of the connection line
with your mains connection socket. By connecting
it to the supply mains, the light is in operation.
ATTENTION! Risk of injury!
Lay the cables and supply lines in a way that no
tripping hazards occur!
Also, consider the regulations concerning working
safety!
Cable winding
With the cable winding mounted on the back, the
connecting line can be winded. Therefore, optimal
flexibility for the mobile use in relation to trans-
portation and packaging is guaranteed.
Содержание ALDEBARAN GLADIUS 2K LED
Страница 8: ...8 DEUTSCH Notizen...
Страница 15: ...15 ENGLISH Notes...