
Sethco
800 Emlen Way, Telford, PA 18969
Tel:
215-799-2577 •
Fax:
215-799-0920
w
ww
ww
w..s
se
etth
hc
co
o..c
co
om
m •• iin
nffo
o@
@s
se
etth
hc
co
o..c
co
om
m
ZKX 3/4CS OPERATIONAL START-UP CHECKLIST
SETHCO
A Met-Pro Fluid Handling Technologies Company
Thermoplastic Pumps
7
Pump mount is level and plumb.
Mounting bolts are tight.
Motor mounting bolts tight.
Suction and discharge connections secure.
Electrical connections secure and covered.
Turn motor fan by hand, ensure that it does not bind.
Jog motor/Check rotation. (Motor Fan)
Discharge valve is slightly open.
Ensure that pump is filled with liquid to the proper submergence.
Start pump and open discharge valve to desired flow rate.
Check for excessive vibration and motor bearing temperature.
Содержание ZKX 3/4CS
Страница 9: ...ZKX 3 4CS ASSEMBLY DRAWING 8...
Страница 10: ...ZKX 3 4CS OUTLINE DRAWING 9...
Страница 11: ...ZKX 3 4CS CURVES 3500 RPM 10 3500 RPM 3500 RPM...
Страница 12: ...ZKX 3 4CS WIRING DIAGRAMS 11...
Страница 13: ...12 NOTES...