Sethco ZKX 3/4CS Скачать руководство пользователя страница 8

Sethco

800 Emlen Way, Telford, PA 18969

Tel: 

215-799-2577 •

Fax:

215-799-0920

w

ww

ww

w..s

se

etth

hc

co

o..c

co

om

m •• iin

nffo

o@

@s

se

etth

hc

co

o..c

co

om

m

ZKX 3/4CS OPERATIONAL START-UP CHECKLIST

SETHCO

A Met-Pro Fluid Handling Technologies Company

Thermoplastic Pumps

7

Pump mount is level and plumb.

Mounting bolts are tight.

Motor mounting bolts tight.

Suction and discharge connections secure.

Electrical connections secure and covered.

Turn motor fan by hand, ensure that it does not bind.

Jog motor/Check rotation. (Motor Fan)

Discharge valve is slightly open.

Ensure that pump is filled with liquid to the proper submergence.

Start pump and open discharge valve to desired flow rate.

Check for excessive vibration and motor bearing temperature.

Содержание ZKX 3/4CS

Страница 1: ...l 215 799 2577 Fax 215 799 0920 w ww ww w s se et th hc co o c co om m i in nf fo o s se et th hc co o c co om m O O O OP P P PE E E ER R R RA A A AT T T TI I I IN N N NG G G G I I I IN N N NS S S ST...

Страница 2: ...t th hc co o W Wa ar rr ra an nt ty y 2 S Sa af fe et ty y R Ru ul le es s 3 O Op pe er ra at ti in ng g I In ns st tr ru uc ct ti io on ns s 4 General Description 4 Pre installation 4 Pump Installati...

Страница 3: ...atory tests with cold water as outlined in the Hydraulic Institute Standards Due to the inaccuracies of field testing the results of any such tests conducted by or for the Buyer shall be interpreted a...

Страница 4: ...rom any and all work areas Keep hands fingers or tools from contacting the impeller during operation of the pump and system Disconnect lock and tag out the main power source to prevent accidental star...

Страница 5: ...pump shaft must be vertical to avoid damage during operation PIPINGTHE PUMP The pump has been designed with all necessary strength factors for a long reliable service life However due to thermoplastic...

Страница 6: ...ry Periodically check pressure and flow rates Adjust if necessary DISASSEMBLY Ensure that the motor is shut off then lock and tag out power supply Check that the discharge valve is shut and any liquid...

Страница 7: ...letely plugged Wrong direction of rotation Air leak in the suction line Discharge valve closed INSUFFICIENT DISCHARGE Air leaks in suction Speed too low System head higher than anticipated Insufficien...

Страница 8: ...Pump mount is level and plumb Mounting bolts are tight Motor mounting bolts tight Suction and discharge connections secure Electrical connections secure and covered Turn motor fan by hand ensure that...

Страница 9: ...ZKX 3 4CS ASSEMBLY DRAWING 8...

Страница 10: ...ZKX 3 4CS OUTLINE DRAWING 9...

Страница 11: ...ZKX 3 4CS CURVES 3500 RPM 10 3500 RPM 3500 RPM...

Страница 12: ...ZKX 3 4CS WIRING DIAGRAMS 11...

Страница 13: ...12 NOTES...

Страница 14: ...ED TRADEMARK OF MET PRO CORPORATION OM 354 05 PVDF409 800 Emlen Way Telford PA 18969 Tel 215 799 2577 Fax 215 799 0920 w ww ww w s se et th hc co o c co om m i in nf fo o s se et th hc co o c co om m...

Отзывы: