background image

 

W

 

 

Warranty

 

OMM.W.S.ZZ.02

 

W

1

 

March

 

2019

 

Warranty

 

 

General

 

Policy

 

This

 

warranty

 

applies

 

to

 

the

 

original

 

equipment

 

owner

 

and

 

is

 

not

 

transferable.

 

Seresco

 

Technologies

 

Inc.

 

warrants

 

as

 

set

 

forth

 

and

 

for

 

the

 

time

 

periods

 

shown

 

below

 

that

 

it

 

will

 

furnish,

 

through

 

a

 

Seresco

 

Technologies

 

Inc.

 

authorized

 

installing

 

contractor

 

or

 

service

 

organization,

 

a

 

new

 

or

 

rebuilt

 

part

 

for

 

a

 

factory

 

installed

 

part

 

which

 

has

 

failed

 

because

 

of

 

defect

 

in

 

workmanship

 

or

 

material.

 

Warranty

 

Void

 

Unless

 

Registered

 

Warranty

 

is

 

void

 

unless,

 

upon

 

start

up

 

of

 

the

 

equipment,

 

the

 

“Warranty

 

Registration

 

and

 

Start

up

 

Report”

 

is

 

completed

 

and

 

sent

 

to

 

the

 

factory

 

within

 

one

 

week

 

of

 

initial

 

start

up.

 

This

 

report

 

will

 

also

 

register

 

the

 

compressor

 

warranty

 

with

 

the

 

compressor

 

manufacturer.

 

Initial

 

90

day

 

Warranty

 

During

 

the

 

first

 

90

 

days

 

from

 

initial

 

start

up

 

and

 

prior

 

to

 

the

 

completion

 

of

 

the

 

24

th

 

month

 

from

 

date

 

of

 

shipment,

 

whichever

 

comes

 

first

 

and

 

subject

 

to

 

prior

 

written

 

approval

 

from

 

the

 

factory,

 

Seresco

 

Technologies

 

Inc.

 

will

 

provide

 

and/or

 

reimburse

 

the

 

required

 

labour,

 

materials,

 

and

 

shipping

 

and

 

handling

 

costs

 

incurred

 

in

 

the

 

replacement

 

or

 

repair

 

of

 

a

 

factory

 

installed

 

defective

 

part.

 

Only

 

the

 

labour

 

required

 

to

 

replace

 

the

 

defective

 

part

 

is

 

warrantied

 

 

travel

 

time,

 

diagnostic

 

time,

 

per

 

diems,

 

truck

 

charges,

 

etc.

 

are

 

not

 

covered

 

under

 

this

 

warranty.

 

WebSentry

 

Conditional

 

One

 

Year

 

Extended

 

Labour

 

Warranty

 

The

 

initial

 

90

day

 

labour

 

warranty

 

shall

 

be

 

extended

 

for

 

a

 

total

 

of

 

12

 

months

 

from

 

initial

 

start

up

 

and

 

prior

 

to

 

the

 

completion

 

of

 

the

 

24

th

 

month

 

from

 

date

 

of

 

shipment,

 

whichever

 

comes

 

first

 

and

 

subject

 

to

 

prior

 

written

 

approval

 

from

 

the

 

factory.

 

The

 

provided

 

equipment

 

must

 

be

 

connected

 

and

 

communicating

 

to

 

Seresco's

 

WebSentry

 

online

 

control

 

and

 

monitoring

 

service

 

for

 

the

 

entire

 

term

 

of

 

the

 

warranty

 

extension.

 

Seresco

 

Technologies

 

Inc.

 

will

 

provide

 

and/or

 

reimburse

 

the

 

required

 

labour,

 

materials,

 

and

 

shipping

 

and

 

handling

 

costs

 

incurred

 

in

 

the

 

replacement

 

or

 

repair

 

of

 

a

 

factory

 

installed

 

defective

 

part.

 

Only

 

the

 

labour

 

required

 

to

 

replace

 

the

 

defective

 

part

 

is

 

under

 

warranty

 

 

travel

 

time,

 

diagnostic

 

time,

 

per

 

diems,

 

truck

 

charges,

 

etc.

 

are

 

not

 

covered

 

under

 

this

 

warranty.

 

Two

 

Year

 

Parts

 

Warranty

 

If

 

any

 

factory

 

installed

 

part

 

supplied

 

by

 

Seresco

 

Technologies

 

Inc.

 

fails

 

because

 

of

 

a

 

defect

 

in

 

workmanship

 

or

 

material

 

prior

 

to

 

the

 

completion

 

of

 

the

 

24

th

 

month

 

from

 

date

 

of

 

shipment,

 

Seresco

 

Technologies

 

Inc.

 

will

 

furnish

 

a

 

new

 

or

 

rebuilt

 

part

 

F.O.B.

 

factory.

 

No

 

labour

 

reimbursement

 

will

 

be

 

made

 

for

 

expenses

 

incurred

 

in

 

making

 

field

 

adjustments

 

or

 

parts

 

replacement

 

outside

 

the

 

Initial

 

90

day

 

Warranty

.

 

Seresco

 

Technologies

 

Inc.

 

reserves

 

the

 

right

 

to

 

have

 

the

 

defective

 

part

 

returned

 

to

 

the

 

factory

 

in

 

order

 

to

 

determine

 

the

 

warranty

 

applicability.

 

Parts

 

shipping

 

and

 

handling

 

costs

 

(to

 

and

 

from

 

the

 

factory)

 

are

 

not

 

covered

 

outside

 

of

 

the

 

Initial

 

90

day

 

Warranty

.

 

 

 

 

Содержание CLASSIC NE-002

Страница 1: ...OPERATION AND MAINTENANCE MANUAL NE 002 to NE 016 NE 204 to NE 232 COMPACT Indoor Model NE SERIES DEHUMIDIFIERS serescodehumidifiers com...

Страница 2: ...or Air Condensers and Fluid Coolers Layout and Components D 4 Chapter E Sequence of Operation E 1 Set Points E 1 Ventilation E 1 Air Conditioning Dehumidification and Pool Heating E 1 o Compressor s E...

Страница 3: ...B Table of Content B 2 This page is left blank...

Страница 4: ...ive procedures Failure to follow safety procedures can result in serious injury or death Beware of moving parts and hot surfaces Make sure to stop all moving parts fans blowers etc before accessing th...

Страница 5: ...airservices com Attention Installation and Service Contractors WARNING Any work installation start up service maintenance repair etc on any mechanical equipment dehumidifier outdoor condenser fluid co...

Страница 6: ...to 32 ton cooling capacity appx models NE204 to NE232 Airflow and ductwork connection options Return Supply and Outdoor Air see Pic C 1 Optional Pool Water Heating Optional Space Heating hot water coi...

Страница 7: ...ystem such as geothermal cooling tower etc Therefore only one of these options present with the actual dehumidifier Gas line If the dehumidifier is equipped with a gas heater boiler gas furnace etc fo...

Страница 8: ...ers one stacked on the top of another however it could also be composed of two dehumidifiers horizontal OR vertical installed side by side or separately still being controlled as one Air Conditioning...

Страница 9: ...clearances should be maintained for adequate airflow and heat rejection Generally up to 36 side and 96 top clearances are required For more information on clearances as well as equipment dimensions a...

Страница 10: ...C General Information OMM C S SL 01 C 7 February 2020 Pic C 4 B...

Страница 11: ...to show External systems connections location direction pool space heating cooling circuits condensate Air filter locations quantity and size Additional Info warning caution stickers etc Wiring Diagra...

Страница 12: ...to submittal documentation Pic D 1 below shows all most available options some of which may not be present on your dehumidifier Dehumidifier Main Components 2 1 3 5 4 7 8 9 11 10 13 14 15 18 17 16 Pi...

Страница 13: ...dehumidifier Compressor 13 Receiver 14 and other components are located within the Compressor Compartment 3 o If the dehumidifier has the standard pool water heating option the compressor circuit incl...

Страница 14: ...k downstream of the space heater If the dehumidifier is equipped with the pool heating option the Pool Water Temperature sensors Pool In 25 and Pool Out 26 measure the entering and leaving pool water...

Страница 15: ...cooler piping connections 33 are identified respectively IN OUT Hot gas Liquid etc In some cases fluid cooler piping connection s may be located within pump package box 37 if fluid cooler is provided...

Страница 16: ...ablishes glycol mixture circulation through the fluid cooler and dehumidifier Expansion tank 39 compensates for temperature based glycol volume fluctuation The pump package electrical sub panel 40 con...

Страница 17: ...D Layout and Components D 6 This page is left blank...

Страница 18: ...Occupied and Spectator or call for Economiser Mode as part of Air Conditioning and or Dehumidification operation Note Externally installed Exhaust Fan s and Outdoor Air damper s could be also control...

Страница 19: ...ssor pressure is higher than pre set level see Outdoor Condenser and Fluid Cooler Operation below Once demand for the compressor s operation is removed respective call is satisfied the pump down solen...

Страница 20: ...air temperature drops below the set point the dehumidifier control system issues a call for Space Heating Mode and engages space heater electric heater hot water coil with valve etc by sending space...

Страница 21: ...E Sequence of Operation E 4 This page is left blank...

Страница 22: ...umidifier etc Advanced Access to advanced settings and features Help Context sensitive help presenting information related to the viewed page Most common basic maintenance tasks performed using Touch...

Страница 23: ...ltage etc is outside of pre set limits Check Voltage Monitor info status incoming power voltage Compressor HP1 X LP1 X SupHeat1 DisTemp1 Various compressor related alarms relevant to Compressor high d...

Страница 24: ...parate RJ 45 jack plastic black is mounted on the control board directly for TouchDisplay connection Make sure to use the proper jack metal surface one located on the sub board for Web Monitor connect...

Страница 25: ...F Interface and Communication F 4 This page is left blank...

Страница 26: ...R3 Module top or horizontal only R3 Module Discharge Air Supply SA or Exhaust EA depending on R3 Module Operational Options see below ductwork connection horizontal Note This chapter applies to dehumi...

Страница 27: ...front center or side right depending on R3 Module size and other features Refer to your equipment submittal and other documentation for more details o For piping connections sizes and flow direction...

Страница 28: ...under the evaporator coil is pumped by condensate pump 58 through the water filter into the nozzle manifold 59 to spray condenser coil with cool mist Dehumidifier with R3 Module Sequence of Operation...

Страница 29: ...to full flow pool water heat exchanger or evaporative cooling coil If any amount of heat is diverted into the evaporative cooling coil o R3 module exhaust fan is controlled as outdoor condenser fan it...

Страница 30: ...erforming any equipment maintenance work make sure that all moving parts are stopped and it is safe to perform required task Maintenance Key Points Here are some basic key maintenance considerations p...

Страница 31: ...y Verify that all set points are correctly programmed as specified by the facility operator Semi Annually Inspect and clean the drain pan s Tighten electrical connections if required Check and tighten...

Страница 32: ...ils Warning Hazardous chemicals Cleaning agents can be highly acidic or alkaline Handle all chemicals carefully and use appropriate personal protective equipment PPE Refer to the cleaning agent manufa...

Страница 33: ...tire system fluid cooler piping dehumidifier etc Have each local high point of the system equipped with means to bleed the air air bleeding valve etc Have each local low point of the system equipped w...

Страница 34: ...nty WebSentry Conditional One Year Extended Labour Warranty The initial 90 day labour warranty shall be extended for a total of 12 months from initial start up and prior to the completion of the 24th...

Страница 35: ...em not supplied by Seresco Technologies Inc 6 Products on which the model and or serial number plates have been removed or defaced 7 Products which have become defective or damaged as a result of unau...

Страница 36: ...tended warranty must be purchased before the shipment of the equipment Seresco Technologies Inc will provide a replacement Airside Coil for 60 months from the date of shipment provided the failed coil...

Страница 37: ...ry with transportation prepaid This extended component warranty is subject to all the terms of the standard Seresco Technologies Inc warranty but applied to the driveline components only Driveline Com...

Отзывы: