Step 10 Install 2x4 Tie Plates
1.
Cut a 2x4-12' in half and install a 6' long 2x4 flush with the 2x4 top plate on the front wall
panel. Use 10d coated sinker nails, double row, spaced 18" apart. Install a 2x4-12' board
next, and then install the other 6' long 2x4 flush with the right corner. Repeat to install 2x4s
across the top of the back wall.
2.
Cut a 12' long 2x4 to 137". Install on the end wall. Repeat on the opposite end wall.
Step 11 Loft Flooring Layout
4' x 4'
4' x 8'
4' x 8'
4' x 6'
2' x 4'
2' x 4'
2' x 4'
2' x 4'
2' x 8'
2' x 8'
4' x 4'
2' x 4'
4' x 8'
144" To Center of Floor
For reference later, draw a line in
the center of the floor.
The diagram below show the loft sheathing layout with the open area position on the right.
Draw a line to mark the center of the loft floor.
137" Tie Plates
2x4-6' Tie Plate
2x4-12' Tie Plate