background image

Stud Spacing

X

X

X

X

X

X

X

X

Step 3

Assemble 12' Back Wall Frame

Treated Bottom Plate

1.

Cut, if necessary, (2) two 2x4-12' (one will be treated) to a length of 144". Position the

boards together and indicate with 'X'  marks where the wall studs will be located.

12'-0"Top Wall Plate

12'-0" Treated Bottom Plate

24"

23-1/4"

24"

2.

Install (9) nine pre-cut wall studs between the top and bottom plates.

Nail the treated bottom plate to each wall stud with (2) two 16d

galvanized deck nails. Use (2) two 10d coated sinker nails per stud to
secure the top plate.

Pre-cut 2x4

Wall Studs

Содержание the Pinewood

Страница 1: ...ot be copied in whole or in part without consent from Reynolds Building Systems Inc Copyright 2020 Assembly Book Manufactured by Reynolds Building Systems Inc 205 Arlington Drive Greenville PA 16125 S...

Страница 2: ...t floor walls and loft floor are completed Framing lumber for the first floor walls and loft floor exterior siding loft flooring roof sheathing and a 32 pre hung six panel steel door with lock will be...

Страница 3: ...th of floor joists Shorten joist measurements if necessary to obtain 14 0 building width 7 Install 10 ten floor joists between the 12 joist headers Secure with 16d galv deck nails Constructing Details...

Страница 4: ...runners Stagger the 2x6 blocks to make it easier to nail the block between the joist 4x4 11 It is important that the floor be level and square Measure the floor diagonally corner to corner Then measur...

Страница 5: ...r and indicate with X marks where the wall studs will be located 96 Top Wall Plate 96 Treated Bottom Plate 24 23 1 4 24 The length of pre cut wall studs will vary from 92 1 4 to 93 depending on your l...

Страница 6: ...Top Wall Plate 96 Treated Bottom Plate 24 23 1 4 26 2 Install 5 five pre cut wall studs between the top and bottom plates Nail the treated bottom plate to each wall stud with 2 two 16d galvanized dec...

Страница 7: ...together and indicate with X marks where the wall studs will be located 12 0 Top Wall Plate 12 0 Treated Bottom Plate 24 23 1 4 24 2 Install 9 nine pre cut wall studs between the top and bottom plates...

Страница 8: ...ether and indicate with X marks where the wall studs will be located Mark an S on bottom plate where the door header supports will be located See drawing below 2 Install 8 eight pre cut studs over the...

Страница 9: ...indicate with X marks where the wall studs will be located Step 5 Assemble a 13 5 Long End Wall Frame Treated Bottom Plate Pre cut 2x4 Wall Studs 2 Install 9 nine pre cut wall studs between the top a...

Страница 10: ...be located See drawing below 2 Assemble the front wall frame using the wall plates cut above and install 6 six pre cut wall studs over the X marks 3 Cut 2 two pre cut studs to a length of 82 Install o...

Страница 11: ...Brace center frames with pre cut studs 13 5 Wall Frame 1 Erect a 8 long wall frame on the back side of the floor IMPORTANT make sure frames are square and plumb 3 Butt a 12 long wall frame to 8 frame...

Страница 12: ...the front wall 8 Locate 2 two 13 x 48 siding panels Install siding above the door opening with bottom edge 3 4 below door header If necessary cut top flush with other siding panels 9 Install the rema...

Страница 13: ...hen installed 5 Repeat to install joist headers on the opposite end of the building Step 10 Install 2x8 Joist Headers on Back Walls 1 Cut a 12 long 2x8 board to 139 Install this 2x8 to the 8 back wall...

Страница 14: ...ilding 1 Install joist hangers on all 2x8 joist headers over the X marks flush with the bottom of the 2x8s Use 1 1 2 hanger nails Joist Hanger Step 11 Install 2x8 Floor Joist 2 Cut a 2x8 14 to 161 and...

Страница 15: ...lush with the top of the loft flooring Install all trim using 6d galvanized box nails spaced 12 apart 1x4 Trim 1 1 2 x 10 Filler Depending on the pre cut stud length and if the siding extends below th...

Страница 16: ...he 14 2 long 2x4 Measure again from opposite knee The measurements should be the same see Detail C 4 It is important that both gables and the trusses are built the same Temporarily tack 1x4 blocks inc...

Страница 17: ...x4 plate using 2 two 10d sinker nails See Detail E DETAIL E 62 5 8 Stud 70 5 8 Stud 7 8 S t u d 3 1 2 x 8 Gusset Framing Square 3 1 2 x 8 Gusset 3 1 2 x 8 Gusset 7 Attach 36 gable stud using a 2 1 2 l...

Страница 18: ...sting the gable frame on these boards will make it easier to install the siding 3 Install a 12 x 44 1 2 siding panel that has a tongue edge Install the siding with the cut edge flush with the side of...

Страница 19: ...2x4 12 Step 16 Install Gable 2x4 12 Brace 2x4 Block DETAIL F 4 Nail bottom edge of siding to 1x4 trim with 6d galvanized nails spaced 12 apart 5 Erect gable on the opposite end Siding Extends Over Tri...

Страница 20: ...en an 8 long 2x6 Cut last board to fit 2 Repeat on front wall 1 Lay truss parts inside the 1x4 blocks used around gable frames One end of the 70 3 8 long 2x6 boards have a blue mark Place these ends t...

Страница 21: ...g Install the hangers using 6d common nails 5 Remove the 2x4 12 boards used to brace the gable As you progress setting trusses tack these boards to keep trusses plumb Don t remove the 2x4s until the r...

Страница 22: ...extend 3 8 past the corner trim on the end wall Use 6d galv nails 2x4 Block 1x4 Corner Trim on End Wall 4 Space 6 Cut an 8 long 1x4 trim board to fit between the soffit board and the bottom of the sid...

Страница 23: ...48 20 3 4 x 96 20 3 4 x 48 2 Locate 2 two 48 x84 OSB sheets packed in our kit and cut to a length of 75 3 Make certain the trusses and the gables are plumb Starting from front left end install 7 16 O...

Страница 24: ...he vertical cut located at the peak of the gable Install 1x6 flush with the top of the roof sheathing Use 6d galv nails spaced 12 apart 2 Install 75 1 4 long 1x6 white pine trim boards at the side of...

Страница 25: ...will serve as a door stop when the doors are closed Use 6d galv nails spaced 12 apart 1x6 Keystone 48 1 2 Door Trim 84 LP Door Jamb 3 Install 2 two 1x4 84 3 4 long trim boards flush to the sides of th...

Страница 26: ...trim to allow room for the doors to expand due to humidity 4 Determine position of hinges and install to side trim with 2 screws 5 Install the window using the short white screws 6 Install door handl...

Страница 27: ...long 1x3 trim boards along each side of the window flush with the top frame Note the front flange projects above the window frame creating a slot for the trim The top trim will rest on the side trim T...

Страница 28: ...8 Truss Top Cord 4 ea 2x6 x 62 1 8 Truss Leg 2 ea 2x4 x 48 Pre built Soffit 4 ea 24 x 9 Truss Ridge Gusset 8 ea 24 x 14 1 2 Truss Knee Gusset 4 ea H 1 Metal Truss Hangers 6 ea 2x8 Metal Joist Hangers...

Страница 29: ...2 x 44 1 2 2 3 8 LP Wall Siding 48 x 13 2 7 16 OSB Sheathing 48 x 84 4 7 16 OSB Sheathing 48 x 72 2 7 16 OSB Sheathing 48 x 27 2 7 16 OSB Sheathing 27 x 51 2 7 16 OSB Sheathing 20 3 4 x 51 2 7 16 OSB...

Отзывы: