161" Long 2x8
3.
Cut (8) eight 2x8 to 158" and install between the
2x8 joist headers. Secure with 1-1/2" hanger nails.
4.
Install floor joist to the opposite end of the building.
1.
Install joist hangers, on all 2x8 joist headers, over the 'X' marks,
flush with the bottom of the 2x8s. Use 1-1/2" hanger nails.
Joist Hanger
Step 11 Install 2x8 Floor Joist
2.
Cut a 2x8-14' to 161" and install to the end of the 2x8 joist headerswith (3) three 10d sinkers.
161" Long 2x8
If 2x8-14' boards are not available 16' long 2x8 will be substituted.
158" Long 2x8