L4AS
P. 1 / 3
EM-1991 Rev.6
BEFORE USE ....
Thank you for choosing M-System. Before use, check the
package you received as below.
If you have any problems or questions with the product,
please contact M-System’s Sales Office or representatives.
■
PACKAGE INCLUDES:
Signal conditioner ................................................... (1)
■
MODEL NO.
Check that model No. described on specification label is
exactly what you ordered.
■
INSTRUCTION MANUAL
This manual describes necessary points of caution when you
use this product, installation, connection and basic mainte-
nance procedures.
COMPONENT IDENTIFICATION
■
FRONT PANEL CONFIGURATION
INSTRUCTION MANUAL
MODEL
L4AS
QUAD DC ALARM
INSTALLATION
■
DIN RAIL MOUNTING
Set the unit so that its DIN rail adaptor is at the bottom.
Position the upper hook at the rear side of the unit on the DIN
rail and push in the lower. When removing the unit, push
down the DIN rail adaptor utilizing a screwdriver (–) and
pull.
■
WALL MOUNTING mm (inch)
MODEL
L4AS
50
100
%
0
2
1
3
4
50
100
%
0
50
100
%
0
50
100
%
0
Specification Label
Connection Diagram
Body
1
2
3
4
Monitor LED
Setpoint Adj.
1
2
3
4
Monitor LED
Setpoint Adj.
■
SCREWDRIVER ADJUSTMENTS
■
DIAL ADJUSTMENTS
DIN Rail
35mm wide
Spring Loaded
DIN Rail Adaptor
2–M5
60 (2.36)
75 (2.95) MIN.
60 (2.36)
60 (2.36)
■
M5 SCREWS
2–M4
60 (2.36)
75 (2.95) MIN.
60 (2.36)
50 (1.97)
■
M4 SCREWS
Rugghölzli 2
CH - 5453 Busslingen
Tel. +41 (0)56 222 38 18
Fax +41 (0)56 222 10 12
www.sentronic.com
Produkte, Support und Service
SENTRONIC
AG