
U
V
W
N
PE
EN
Installation instructions, only for experts
p. 17/24
Connection of Qube 9 kW and 10.5 kW
(QUBE-090 / QUBE-105)
1. Guide the connection cable through the feed-
through
4
.
2. Connect the connectors of the connection
cable to the U – V – W – N – PE terminals
of the sauna heater and to the applicable
sauna control unit terminals. Observe the
installation instructions for the sauna control
unit when doing so.
3. Reattach the cover panel
1
to the heater.
4.7. Electrical connection
1. Unscrew the screws
2
and
3
with a screwdriver.
2. Remove the cover plate
1
.
4
2
3
1
Содержание 1-028-594
Страница 49: ...NOTIZEN APPUNTI NOTES NOTE NOTITIES...
Страница 50: ...NOTIZEN APPUNTI NOTES NOTE NOTITIES...
Страница 51: ...NOTIZEN APPUNTI NOTES NOTE NOTITIES...