Appendix H - Sentek Plus Quick Reference Guide
Product Set-up Checklist
Copyright © 2005-2012 Sentek Pty Ltd All rights reserved
Page 46
Figure 42 Sentek EasyAG PLUS interface wiring
3. Insert the probes into the access tubes.
4. Flat Cap probes only: Install the 7-pin quick connector on the Flat Cap cable and plug it into the DTU
cable.
5. Connect the antenna, battery and then solar panel to the DTU.
6. Switch the DTU on, check the probe clock time and test the sensors. Then test the upload function of
the probe.
Software
Allow probe time to upload readings to the server.
1. Enter the server details into Data Exchange (Edit Server).
2. For each probe, use the New Database Wizard and Download Wizard within an IrriMAX workspace to
set up new databases and associated downloads.
3. Create graphs, save the workspace and create a batch file to run the downloads.
Example Batch File:
“Path to IrriMax.exe" "path to workspace.sws" /DOWNLOAD
Probe
Cable
Red
Orange
Brown
Black
Blue
Purple
Green
Yellow
Содержание PLUS
Страница 1: ...SentekTM PLUS H HA AR RD DW WA AR RE E M MA AN NU UA AL L V VE ER RS SI IO ON N 2 2 1 1 ...
Страница 7: ......
Страница 8: ...Copyright 2005 2012 Sentek Pty Ltd All rights reserved Page vii ...
Страница 52: ......