10
Quick Start Deployment Guide (No Computer)
Unpack the sensor unit and check for any physical damage or obstructions at the
sensor openings. Open enclosure cover and check for any loose or damaged
components. Make sure all wires are securely fastened as shown in the internal
sensor view on page 7 and refer to the LEDs indicated on page 8.
1)
Power on unit. The illuminated switch should turn on. If the switch does
not illuminate, inspect all wiring connections and charge battery.
2)
Verify that the SD card was detected and initialized with the SD status LEDs
3)
Verify the absence of sensor errors with sensor status LED.
4)
If HTTP or MQTT protocol is selected verify successful initialization after
startup with Cellular status. If PERIODIC protocol is used wait for required
amount of time before cellular post.
5)
If power is hooked up, wait for 1 minute after power up to verify the
charging status LED is illuminated. Please note that if the battery is
completely full the charging status LED will not illuminate.
6)
When installing orient the weather sensor such that it is pointing North.
Failure to do this will result in arbitrary wind direction. The North direction
is indicated with a notch on the ultrasonic anemometer base. See page 11
for anemometer instructions. Never rotate the anemometer from the top
or severe damage will occur.
7)
After initialization is complete the illuminated switch will flash once per
second to indicate normal operation
Содержание SPOD
Страница 6: ...6 Sensor Exterior Features Front Exterior ...
Страница 7: ...7 Sensor Interior Features Front Interior ...
Страница 12: ...12 Ultrasonic Anemometer Mounting Instructions ...