![SELWOOD A24670E Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/selwood/a24670e/a24670e_installation-and-operating-instructions-manual_1237303021.webp)
Fig. 4.1
Hardware
Wood Parts
The top of the (F17) End Floor will be flush with the floor boards
A:
From inside the fort measure 13-1/8” from the Half Wall side (F13) Post and then attach (A11) Long Wall
Support to (F17) End Floor and (F8) SL Ground with 4 (S1) #8 x 1-1/8” Wood Screws. (fig. 4.1 & 4.2)
B:
On the outside of the fort and tight to the top of (F8) SL Ground attach (A7) Long Trim to the Entrance Wall
side (F13) Post with 4 (S2) #8 x 1-1/2” Wood Screws. The (A7) Long Trim should be flush to the outside edge
of (A14) Door Trim. (fig. 4.1)
C:
Tight to the bottom of (F17) End Floor and tight to (A7) Long Trim attach (A12) Window Top to both (F13)
Posts using 4 (S2) #8 x 1-1/2” Wood Screws and to (A11) Long Wall Support with 2 (S1) #8 x 1-1/8” Wood
Screws. (fig. 4.1)
Fig. 4.2
21
Step 4: Window Wall Assembly for Spiral Slide
& Monkey Ladder Side
Inside Fort View
Outside Fort View
6 x
#8 x 1-1/8” Wood Screw
8 x
#8 x 1-1/2” Wood Screw
S2
S1
A12
F13
F17
F8
A11
A11
F13
13-1/8”
F17
S2
S2
S1
1 x
Long Trim 1 x 2 x 38-3/4”
1 x
Long Wall Support 1 x 5 x 46-1/4”
1 x
Window Top 1 x 5 x 37-3/4”
A7
A11
A12
A7
13-1/8”
S1