![Selva Marlin 100 EFI Скачать руководство пользователя страница 122](http://html1.mh-extra.com/html/selva/marlin-100-efi/marlin-100-efi_service-manual_1237203122.webp)
POWR
Power unit
5-53
6D93G11
6.
Connect the fuel hose and shift position
switch coupler.
7.
Connect the PTT motor leads and PTT
switch coupler, and then install the junc-
tion box cover.
8.
Connect the battery leads.
9.
Connect the shift cable and throttle
cable, and then adjust their lengths.
For adjustment procedures, see Chapter
3, “Adjusting the throttle link and throttle
cable” and “Checking the gear shift oper-
ation.”
10. Install all parts removed during disas-
sembly.
11. Check the engine oil level.
NOTE:
If the engine oil is below the minimum level
mark
b
, add sufficient oil until the level is
between
a
and
b
.
T
R
.
.
PTT motor lead bolt:
4 N·m (0.4 kgf·m, 3.0 ft·lb)
T
R
.
.
Positive battery lead nut:
9 N·m (0.9 kgf·m, 6.6 ft·lb)
Recommended engine oil:
4-stroke motor oil
API: SE, SF, SG, SH, or SJ
SAE: 10W-30 or 10W-40
S60C1150
a
b
Содержание Marlin 100 EFI
Страница 1: ...Marlin 100 EFI SERVICE MANUAL ...
Страница 4: ......
Страница 46: ...CHK ADJ Periodic checks and adjustments 3 17 6D93G11 MEMO ...
Страница 137: ...6D93G11 6 14 1 2 3 4 5 6 7 8 9 Bearing inner race attachment 0 90890 06661 Propeller shaft housing ...
Страница 148: ...LOWR Lower unit 6 25 6D93G11 Shimming 6 ...
Страница 153: ...6D93G11 6 30 1 2 3 4 5 6 7 8 9 MEMO Backlash ...
Страница 215: ...6D93G11 8 12 1 2 3 4 5 6 7 8 9 S60V8265 Br B Fuel control system Starting system ...
Страница 244: ...Index i 4 6D93G11 U Upper case 7 6 V Vapor separator 4 10 Ventilation 1 3 Y Diagnostic System 9 2 ...
Страница 245: ...6D93G11 i 5 1 2 3 4 5 6 7 8 9 Index MEMO ...
Страница 247: ......
Страница 248: ......