![SellEton Scales SL-720 Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/selleton-scales/sl-720/sl-720_installation-manual_1237075003.webp)
(844)-735-5386
www.selletonscales.com
FOR WOODEN PLATFORMS
Step 1:
Make sure the wooden platform you've built – or are in the process of building – can withstand
the maximum weight you'll put on it.
Step 2:
Turn the platform upside down.
Step 3:
Drill 2 holes ( Same size & spacing between the holes as the mounting block. Use the mounting
block to draw out the holes first & then drill. Ultimately they need to match up to the load cells, be sure
to take time to do it correctly. this can impact readings if load cells are not positioned correctly.
NOTE:
At all four corners of the platform (x 2 holes should be drilled on every corner). Each hole should
be drilled as close to its respective edge as possible. You need to purchase longer bolts for thicker
platforms. Measure the mounting block & load cell along with the thickness of the platform &
purchase the correct length of bolts. so that the load cell, mounting block & the platform are all
connected firmly.
Step 4:
Use the 1/16" load spacers to bolt the load cells onto the platform. The spacers should be placed
between the load cell & the mounting block. This is necessary to give the load cells adequate room for
accurate readings. ( refers to the picture in this manual)
Step 5:
Take out the junction box. See the below diagram to understand where each of the 4 load cell
cables will need to go into the junction box.
SL-720
INSTALLATION MANUAL - WEIGHING KIT
OVERALL INSTALLATION