background image

 

IN0020

 Revision 05

 004799

 – 5 of 8 

POWER       PERFORMANCE      PASSION 

Installation Notes 

Installing the Grid fail-Generator backup kit into the SP PRO 

Referring to the diagram above (page 4), follow the steps below to install the kit.  

1.

 

Fit 2 x 5mm mounting screws to the base of the SP PRO inverter at position 

A

. Leave 

screws loose. 

2.

 

Fit Grid fail-Generator backup kit to screws as shown. Tighten screws. 

3.

 

Wire the connections from the Grid fail-Generator backup kit to the SP PRO as shown. 
NOTE the polarity of the B+ and B- connections 

4.

 

Wire the Generator L and Grid L to the GEN L and GRID L terminals respectively on the 
Grid fail-Generator backup kit. 

5.

 

Double check all terminals are tight and clamping the wire only and not the insulation.  

Generator Control Wiring 

The Generator Run control wiring is wired into the expansion card as shown.  This configuration 

is for a controller that require two wires to be closed to start and run and then opened to stop 
the generator. 

In a three phase Advanced Multiphase system the Generator Control Wiring is ONLY connected 

to the SP PRO on the L1 phase. 

 

Note: Refer to Tech Note TN0025 for other control options. 

SP PRO Configuration – Additional Configuration Settings 

The Site Configuration Wizard is used to configuration the SP PRO with the Grid Fail – 

Generator Backup. Step though the wizard to setup the system to suite the appropriate 
application. 

 

Note: For more information when stuck through the “Site Configuration Wizard”, right click on 
the page and a help guide will appear to help setup the system. 

 

The settings detailed in Appendix I (pages 7 to 8) will be set when the Site Configuration 
Wizard is used to configure the SP PRO. Only the settings required to enable Grid Fail – 

Generator Backup are shown.  The remainder of systems settings will be set by the Site 

Configuration Wizard. 

Содержание SP PRO SPMC 1201-AU

Страница 1: ...ator that is automatically started and stopped by the SP PRO as required during a grid outage SP PRO Models Grid fail Generator backup kit single phase Grid fail Generator backup kits three phase SPMC 240 AU 004723 1 off SPMCA GFGB 2448 005268 3 off SPMCA GFGB 2448 005268 SPMC 241 AU 004724 SPMC 481 AU 004725 SPMC 482 AU 004726 SPMC 1201 AU 004722 No Kit Available No Kit Available Preparation When...

Страница 2: ...ot restored before a Generator start condition the SP PRO will automatically start the generator and switch over the GFGB contactor to connect the SP PRO AC source input to the generator supply The SP PRO will then synchronise to the generator to charge the batteries and power the loads 5 When the Generator Stop condition is satisfied the SP PRO stops the generator and continues to run from the ba...

Страница 3: ...e following is an overview of the internal and external connections which form part of the Grid Fail Generator Backup Expansion housing Grid Fail Generator Backup in a Single phase system Note Diagram is applicable for 24V and 48V SP PRO Grid Fail Generator Backup in an Advanced Multiphase system ...

Страница 4: ...please leave enough space for the Grid fail Generator backup kit to be installed in the wiring cavity of the SP PRO Please note the following 1 Backup loads connect into the AC Load L and N terminals in the SP PRO 2 Only the L wire from the Grid fail Generator backup connects into the AC Source L terminal within the SP PRO 3 The Grid L connects to the GRID L terminal on the Grid fail Generator bac...

Страница 5: ...e expansion card as shown This configuration is for a controller that require two wires to be closed to start and run and then opened to stop the generator In a three phase Advanced Multiphase system the Generator Control Wiring is ONLY connected to the SP PRO on the L1 phase Note Refer to Tech Note TN0025 for other control options SP PRO Configuration Additional Configuration Settings The Site Co...

Страница 6: ...bled If you wish to enhance this operation consult SP PRO User manual Generator Automatic Start for full details Reference Information RL1 VOLTAGE MONITOR The internal voltage monitor RL1 is factory set and should not be adjusted The factory setting is detailed below 15 8 3 s DIP switches under cover 1 ON DEL REC 2 OFF N E 3 ON 6 s 4 OFF INHIBIT 5 ON 230 VAC 6 OFF 230 VAC WARNING Do not open the D...

Страница 7: ...p generator Alternate AC Source Power maximum power SP PRO will draw from backup generator Min Max AC Voltage allowable voltage range from generator Min Max AC Frequency allowable frequency range from generator Note Default Values shown Adjust values to suit the backup generator External CT and Extern Contactor CT settings are not used in this configuration AC SOURCE GENERATOR CONTROLLER SETTINGS ...

Страница 8: ... Follow Backup Select Note Low Batt Shut Down Override Input setting is not used in this configuration Grid Fail Generator Backup Grid Fail Backup Enabled Grid Available Input Digital Control Input 4 Backup Select Output Relay Output 3 Generator Outputs Generator Run Output Relay Output 1 The actual generator output type used will depend on what signal is required by the backup generator to start ...

Отзывы: