7
2 Assembly preparations
2.1. Tools
2.2 Mast and deck attachment
Before starting with the assembly, make sure you have the following tools available:
• Socket screw driver
• Hack saw
• Torx bits
• Measuring tape
• Knife
• Hammer
• Pencil
If Sta-lok is to be fitted you will also need:
• Two adjustable spanners
• Polygrip
• Tape
• File
•
Locking adhesive (included in the eye fitting pack)
Always make sure that the forestay can articulate in all directions, both in the top and at deck level. Toggles
must be used in most cases to ensure sufficient articulation.
The toggle on the furling unit should always be fitted directly to the chain plate. If the unit is to be fitted below
deck or if it needs to be raised, an extension toggle can be used
but always make sure that the toggle that
comes with the drum unit is attached to the chain plate.
Read the instructions 4.2 before cutting the wire!
For available toggles and extension links, see “Spares and accessories”.
Fig. 2.2.a
Fig. 2.2.d
Fig. 2.2.e
Fig. 2.2.f
Fig. 2.2.b
Fig. 2.2.c