20120723 

Step 4 

Determine the 

Neutral Inst Overcurrent Trip Level

 setting. 

50NN21P = ________________ 

Set the 50N element to 50 percent of the maximum ground fault current. Obtain the maximum value from 
a system fault study. 

For this example, assume a 5,000 A ground fault current. 

Step 5 

Verify that the 

Neutral Inst Overcurrent Trip Delay

 (50NN1D) is set at minimum value of 0.50. 

Step 6 

Select 

Group 1 > Set 1 > Winding 2 Elements

 

Figure 3  Phase Time-Overcurrent Element Settings 

Step 7 

Determine the 

Winding 2 Phase Time Overcurrent Trip Level

 setting. 

51P2P = __________________ 

Set the phase time-overcurrent element to 150 percent of the continuous rated amperes. 

Step 8 

Set the 

Winding 2 Phase TOC Curve Selection

 to coordinate with the downstream time-overcurrent 

protection. 

51P2C = __________________ 

Содержание SEL-387A

Страница 1: ...instantaneous or definite time elements are available for overcurrent protection breaker failure protection overcurrent phase selection for targeting transformer backup protection and so on Two levels...

Страница 2: ...Element Settings Step 2 Determine the Winding 1 Max Phase Time Overcurrent Trip Level setting 51P1P ________________ The transformer maximum expected load equals MVA 1000 kV 3 Set the 51P1 pickup to...

Страница 3: ...5 Verify that the Neutral Inst Overcurrent Trip Delay 50NN1D is set at minimum value of 0 50 Step 6 Select Group 1 Set 1 Winding 2 Elements Figure 3 Phase Time Overcurrent Element Settings Step 7 Det...

Страница 4: ...default values 51P2RS Y 51P2TC 1 Step 11 Save your settings and then send them to the relay Hands On Activity 2 Validate Overcurrent Elements In this hands on activity you will validate the phase and...

Страница 5: ...le Relay Word bit asserts Step 1 Reset relay targets by pushing the TARGET RESET pushbutton located on the relay front panel Step 2 Clear the Sequential Events Recorder SER entries You can perform thi...

Страница 6: ...minals to simulate faults as indicated in Table 1 Step 1 Calculate the expected operate time using the equations from Figure 5 and record your answers in Table 2 Figure 5 Time Overcurrent Operation Eq...

Страница 7: ...rt command or the ACSELERATOR QuickSet HMI Step 3 After the instructor applies the fault current use the TARn serial port command n the Relay Word bit for the element under test or the ACSELERATOR Qui...

Отзывы: