STP-H600/H1000 Series Instruction Manual
2 Unpacking
2.1
Unpacking the STP Pump
Check the following before unpacking the STP pump.
1) Check the package for bruises, breakage, wetness, etc.
If there is any abnormality/error or it is judged necessary to return the product, contact
Seiko Seiki.
2) Check the contents of the package.
See Section 16.3, "Accessories."
CAUTION
◇
The mass of the STP pump is approx. 30 kg. Use a crane or other appropriate
means to lift the STP pump.
Lift the STP pump with an eyebolt or a similar tool that uses the fitting hole
attached to the inlet port flange.
Lift it with the aid of a suspension tool under the base when installing the STP
pump without fitting hole.
◇
Observe national laws/regulations, safety standards and so on when lifting the
STP pump.
◇
Use a crane or other appropriate means sufficient enough to withstand the load
when lifting the STP pump.
◇
Always lift the STP pump in stable places free of excessive shock or vibration to
prevent it from shaking or dropping.
◇
Have at least two people lift the STP pump when doing so by hand.
NOTICE
◇
Be careful not to scratch the flange of the STP pump.
Before installing the STP pump, check whether or not there are scratches on the
surface.
◇
It is recommended to keep the packaging materials, such as the corrugated
fiberboard container and cushioning material for possible reuse.
Figure 2.1 Example of Lifting the STP Pump