
STP-H600/H1000 Series Instruction Manual
FIGURES
Figure 2.1
Example of Lifting the STP Pump......................................................................... 2-1
Figure 3.1
Configuration of the STP Pump ............................................................................ 3-2
Figure 3.2
Installation of the STP Pump to the Vacuum Equipment...................................... 3-5
Figure 3.3
STP Pump Installation Positions........................................................................... 3-7
Figure 3.4
Positions of the Outlet Port on the Horizontally or Slanted Installed STP Pump .. 3-7
Figure 3.5
Example of securing the STP pump (When securing the inlet port with bolts)..... 3-9
Figure 3.6
Example of securing the STP pump
(When securing the inlet port flange with claw clamps)...................................... 3-10
Figure 3.7
Example of securing the STP pump
(When installing the damper in the inlet port flange) .......................................... 3-11
Figure 3.8
Connecting the Purge Port and Emergency Vent. Valve .................................... 3-15
Figure 4.1
STP Control Unit Front Panel ............................................................................... 4-3
Figure 4.2
STP Control Unit Rear Panel ................................................................................ 4-5
Figure 4.3
Inside of the STP Control Unit .............................................................................. 4-7
Figure 4.4
Peripheral Space of the STP Control Unit ............................................................ 4-9
Figure 4.5
Example of Securing the STP Control Unit......................................................... 4-10
Figure 4.6
External Dimensions of Each Cable ................................................................... 4-11
Figure 4.7
External Dimensions of he Power Cable ............................................................ 4-12
Figure 4.8
How to Secure Primary Power Cable ................................................................. 4-16
Figure 8.1
I/O TB2 Remote Output Signal Terminal Block .................................................... 8-3
Figure 8.2
Example of Connecting I/O TB2 R. Pump Terminal ............................................. 8-5
Figure 8.3
Example of Securing the Remote Cable............................................................... 8-5
Figure 8.4
DC I/O TB3 Remote Input Signal Terminal Block................................................. 8-7
Figure 8.5
START STOP TB5 Remote Input Signal Terminal Block ..................................... 8-8
Figure 8.6
START/STOP TB6 Remote Input Signal Terminal Block ..................................... 8-9
Figure 9.1
Life of the Internal Battery..................................................................................... 9-2
Figure 9.2
Allowable Shelf Life of the Internal Battery ........................................................... 9-2
Figure 9.1
How to Replace the Internal Battery ..................................................................... 9-7
Figure 11.1 Cross Sectional View of the STP Pump ............................................................. 11-2
Figure 16.1 External Appearance of the STP Pump
(Example: STP-H1000 Series) ........................................................................... 16-5
Figure 16.2 External Appearance of the STP Control Unit .................................................... 16-6
Figure 16.3 Label Affixing Positions for the STP Pump ......................................................... 16-7
Figure 16.4 Label Affixing Positions for the STP Control Unit ............................................... 16-8
Figure 16.4 Label Affixing Positions for the Special Accessory ............................................. 16-9
13