User Manual Double Disconnect 2500A 

 

 

Segen Solar (Pty) Ltd Reserves the right to implement 
changes to specifications depicted in this Installation manual 
to conform to equipment or regulatory requirements 
to conform to equipment or Regulatory requirements

 

Warranty: 

 

 

This system carries a standard 12-month Warranty from date of purchase. 

Warranty shall be void if not used within strict compliance with the installation manual, and 
the user manual of the protection relay. 

 
 
 

 

WARNING: Please ensure all connections including factory connections are checked, as 
it is  possible for them to loosen during transport and handling.

 

 

 

The ACDB is supplied with the appropriate marking and rating labels, please ensure any 
additional warning or rating information is added to the system as may be required due to 
site specific conditions and location.

 

 

SAFETY FIRST- Equipment to be inspected and tested by suitably Qualified person

 

Содержание DDU-2500A

Страница 1: ...anges to specifications depicted in this Installation manual to conform to equipment or regulatory requirements to conform to equipment or Regulatory requirements Installation Manual 990KW 2500Amp AC...

Страница 2: ...uipment and people are required to ensure the safe operation and maintenance of electrical products appliances or devices This AC protection is designed for both the protection and safe operation of t...

Страница 3: ...tools or equipment such as ladders and scaffolding Description This AC Board is designed for the connection and protection of a single or combiner PV System input not exceeding a total of 2500A 990KW...

Страница 4: ...ensure that the chosen surface is suitable in order to support the weight of the board for example Concrete Plinth It is recommended that the board is mounted vertically Please ensure enough clearanc...

Страница 5: ...24 x 40kW Inverters etc The Number of Inverters exceeding the quantity of one must first be combined in an AC PV Combiner Board as this Board is designed to accept a single input from the PV System R...

Страница 6: ...ements to conform to equipment or Regulatory requirements Fig 3 Fig 3a Fig 4 PV System AC Connection Connect the PV System cable L1 L2 L3 N from the AC protection or combiner board to K2 contactor ter...

Страница 7: ...latory requirements Earthing All Metallic parts of this assembly must be earthed in accordance with the Low Voltage wiring standard requirements The Earth conductor for each individual cable must be c...

Страница 8: ...void if not used within strict compliance with the installation manual and the user manual of the protection relay WARNING Please ensure all connections including factory connections are checked as i...

Отзывы: