V
INSPECTIONS IMMEDIATELY AFTER TRANSPORTING THE PRODUCT TO THE LOCATION
Normally, at the time of shipment, SEGA products are in a status allowing for usage immediately
after transporting to the location. Nevertheless, an irregular situation may occur during
transportation. Before turning on the power, check the following points to ensure that the product
has been transported in a satisfactory status.
Are there any dented portions or defects (cuts, etc.) on the external surfaces of the cabinet?
Are casters and adjusters damaged?
Do the power supply voltage and frequency requirements meet with those of the location?
Are all wiring connectors correctly and securely connected? Unless connected in the correct way,
connector connections can not be made accurately. Do not insert connectors forcibly.
Do power cables have cuts and
dents? Are all accessories
available?
Can all doors and lids be opened with the accessory keys? Can doors and lids be firmly closed?
B
EF
O
R
E
U
S
IN
G
T
H
E
PR
OD
U
C
T,
B
E
SU
R
E
T
O
R
E
A
D
T
H
E
F
OL
L
OW
IN
G:
http://op.sega.jp/op_e/
Содержание Transformers Human Alliance
Страница 1: ...PMA B00590 PMA B00590 OWNER S MANUAL TRANSFORMERS PRINTING http op sega jp op_e...
Страница 7: ...VI http op sega jp op_e...
Страница 13: ...4 3 GAME MACHINE INSTALLATION LOCATION 3 GAME MACHINE INSTALLATION LOCATION http op sega jp op_e...
Страница 14: ...5 4 DIMENSION 4 DIMENSION http op sega jp op_e...
Страница 73: ...64 21 PARTS LIST 21 PARTS LIST http op sega jp op_e...
Страница 81: ...72 22 SCHEMATIC DIAGRAM 22 SCHEMATIC DIAGRAM http op sega jp op_e...
Страница 82: ...73 22 SCHEMATIC DIAGRAM http op sega jp op_e...
Страница 83: ...74 22 SCHEMATIC DIAGRAM http op sega jp op_e...
Страница 84: ...75 22 SCHEMATIC DIAGRAM http op sega jp op_e...