![Sega Transformers Human Alliance Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/sega/transformers-human-alliance/transformers-human-alliance_owners-manual_1233605018.webp)
9
7-2 Work Procedures:
1 After Opening package(Take care not to drop for Billboard and POP),
please assemble Billboard and POP together in advance.
2 After opening the side door of the LCD, install the Billboard assembly.
Locked by 4 pcs of
screws(the screws
ocked false lon the
Billboard)
The 2 pcs of metal( put in the coin box) locked false
by 4 pcs of screws(locked false on the Billboard)
Locked false by 2 pcs of screws
(Locked false on the machine)
Locked tightly by 2 pcs of screws (put into the coin box),and then
connected by 2pcs of connector and locked tightly upside by 6 pcs of screws
(Please see the left picture in green and circle location in blue)
and last lock the backside door of the LCD.
7.
IN
ST
A
L
L
A
T
ION
http://op.sega.jp/op_e/
Содержание Transformers Human Alliance
Страница 1: ...PMA B00590 PMA B00590 OWNER S MANUAL TRANSFORMERS PRINTING http op sega jp op_e...
Страница 7: ...VI http op sega jp op_e...
Страница 13: ...4 3 GAME MACHINE INSTALLATION LOCATION 3 GAME MACHINE INSTALLATION LOCATION http op sega jp op_e...
Страница 14: ...5 4 DIMENSION 4 DIMENSION http op sega jp op_e...
Страница 73: ...64 21 PARTS LIST 21 PARTS LIST http op sega jp op_e...
Страница 81: ...72 22 SCHEMATIC DIAGRAM 22 SCHEMATIC DIAGRAM http op sega jp op_e...
Страница 82: ...73 22 SCHEMATIC DIAGRAM http op sega jp op_e...
Страница 83: ...74 22 SCHEMATIC DIAGRAM http op sega jp op_e...
Страница 84: ...75 22 SCHEMATIC DIAGRAM http op sega jp op_e...