16
ASSEMBLY AND INSTALLATION
6
6-1 INSTALLING THE FLOOR
2
Slide the
Assy Floor Panel (MI-9000XUK)
into position and align with the Monitor Cab. Remove the (2)
M4 fixings on the
Bracket Endcap LED Edging Lower L/R (MI-7009XUK/MI-7010XUK)
and move
them into the lower installation position shown. Connect the floor harnessing on both sides and reapply the
fixings to each bracket, securing the wiring within the bracket
1
Unlock and remove the Door Back Lower with the supplied keys
Unlock with Key
LED Connections
Secure Bracket in
Bracket Endcap LED Edging Lower
lower position