ASSEMBL
Y AND
INST
ALLA
TION
71
6
6
3
Open the SECURITY/CASHBOX DOOR and remove the CASHBOX. Locate the (3) fixings which secure
the CASHBOX FLOOR and remove.
4
Remove the CASHBOX FLOOR to reveal the connection points for the ASSY FLOOR. Connect the (2)
connectors from the ASSY FLOOR to their corresponding connections within the ASSY CONTROL
TOWER
Remove the CASHBOX
Remove (3) fixings
Assy Floor Connection Points
CASHBOX
CASHBOX FLOOR
CASHBOX FLOOR
Содержание MISSION IMPOSSIBLE ARCADE
Страница 126: ...VIDEO DISPLAY 115 11 OSD Structure...
Страница 127: ...116 VIDEO DISPLAY 11 Picture Menu VGA Settings Menu Setup Menu Colour Menu...
Страница 128: ...VIDEO DISPLAY 117 11 User Colour Menu Input Menu OSD Menu OSD Position Menu...
Страница 129: ...118 VIDEO DISPLAY 11 Info Menu Advance Setup Menu...
Страница 140: ...LAMPS AND LIGHTING 13 129...
Страница 141: ...13 LAMPS AND LIGHTING 130 13 2 LED LIGHTING STEP...
Страница 142: ...LAMPS AND LIGHTING 13 131 13 3 LED LIGHTING OUTER CURVE...
Страница 143: ...13 LAMPS AND LIGHTING 132 13 4 LED LIGHTING INNER CURVE...
Страница 144: ...LAMPS AND LIGHTING 13 133 13 5 LED LIGHTING CONTROL PANEL...
Страница 145: ...13 LAMPS AND LIGHTING 134 13 6 LED LIGHTING CONTROLLER...
Страница 146: ...LAMPS AND LIGHTING 13 135 13 7 LED LIGHTING WOOFER...
Страница 147: ...13 LAMPS AND LIGHTING 136 13 8 LED LIGHTING BILLBOARDS...
Страница 148: ...LAMPS AND LIGHTING 13 137 13 9 PASSIVE INFA RED PIR...