
ASSEMBL
Y AND
INST
ALLA
TION
21
6
6-5 COMFIRMATION OF ASSEMBLY
In the test mode, ascertain that the assembly has been made correctly and IC Board is satisfactory.
In the test mode, perform the following test: (refer to chapter 9).
9-3-3 INPUT TEST
This menu is used to test the system inputs such as steering, pedals and buttons. To implement the test, press each
device that is listed and check the results on screen.
9-3-4 OUTPUT TEST
This menu is used to test the system oututs such as Lamps and LED.
9-3-8 NETWORK TEST
Apply and configure the network of each cabinet (only appiles if 2 or more cabinets are linked).
9-3-10 CALIBRATION TEST
This test is required to calibrated both steering mechanism and control pedals. This procedure is always carried out
at the factory before dispatch. However, certain conditions can have an effect on calibration and it is recommended
that re-calibration be carried out at point of installtion.
Содержание KO DRIVE
Страница 7: ...vi NOTES...
Страница 107: ...98 COIN HANDLING 12 STERLING PRICE OF PLAY SETTINGS SW1...
Страница 108: ...COIN HANDLING 99 12 EURO PRICE OF PLAY SETTINGS SW1...
Страница 134: ...125 PARTS LIST 19 1 ASSY TOP KO DRIVE STD US PD 00005UK D 1 2 3 5 1 10 6 18 20 7 8 21...
Страница 145: ...136 PARTS LIST 19 9 ASSY CONTROL PANEL PD 2000UK D 1 2 4 3 201 203 213 211 9 2 202 207 219...
Страница 156: ...147 WIRING DIAGRAMS 21 D 1 2 21 SCHEMATIC DIAGRAMS...
Страница 157: ...148 WIRING DIAGRAMS 21 D 2 2...