vii
TABLE OF CONTENTS
INTRODUCTION vi
1
HANDLING PRECAUTIONS
1
2
PRECAUTIONS REGARDING INSTALLATION LOCATION
4
2-1 LIMITATIONS OF USAGE
5
2-2 OPERATION AREA
6
2-3 OPERATION AREA - MULTIPLE CABINETS
7
3
PRECAUTIONS REGARDING PRODUCT OPERATION
9
3-1 BEFORE OPERATION
9
3-2 DURING OPERATION (PAYING ATTENTION TO CUSTOMERS)
12
4
PARTS DESCRIPTION
14
5
ACCESSORIES
15
6
ASSEMBLY AND INSTALLATION
17
6-1 UNPACKING THE CABINETS
20
6-2 JOINING THE CABINETS
22
6-3 INSTALLING THE BILLBOARD
25
6-4
INSTALLING
MULTIPLE
CABINETS
27
6-5 LINKING THE CABINETS (COMMUNICATION)
28
6-6 APPLYING POWER
29
7
PRECAUTIONS WHEN MOVING
32
7-1 MOVING THE MACHINE
33
8
GAME DESCRIPTION
35
9
EXPLANATION OF TEST AND DATA DISPLAY
46
9-1 SWITCH UNIT
47
9-2 TEST MODE
48
10
VIDEO DISPLAY
69
10-1 GENERAL DESCRIPTION
69
10-2 CLEANING THE SCREEN
70
10-3 ADJUSTMENT METHOD
71
11
CONTROL UNITS
75
11-1 CONTROLLER - EXPLODED DIAGRAM
77
11-2 BRAKE AND ACCELERATOR UNIT
78
11-3 ADJUSTING/REPLACING THE VOLUME POT
80
11-4 GREASING
81
11-5 SHIFT LEVER
82
Содержание Daytona Championship USA
Страница 107: ...LAMPS AND LIGHTING 99 13 3 Remove and replace any and all faulty SLED RINGs 4 Resecure by following steps in reverse...
Страница 122: ...114 DESIGN RELATED PARTS 17 DA 7734UK DA 7744UK DA 7725UK DA 7726UK...
Страница 128: ...120 PARTS LIST 18 4 ASSY SUB MONITOR CABI DA 7050XUK D 1 2 1 2 3 101 201 202 204 204...
Страница 150: ...3 of 3 DA 60120UK DA 60125UK 390 2505 30 AD 390 2505 30 AD DA 6013UK...