11
Ausgabe
issue
C / 11.10.2012
Dokument
document
OM.INS.01e
Blatt
sheet
1 (2)
5
Assembly / Installation
5.1
Mounting tools / lifting gear
5.2
Space requirement
The required space should be determined by considering the following factors:
•
Dimensions and weight.
•
Requisite transport and lifting equipment.
•
Pipe routing – dismantling (dimension for stator replacement).
5.2.1 Dimension for stator replacement (P)
5.3
Assembly of the complete mounted pump
¾
Assemble according to technical data (
→
chapter 3.).
¾
Note dimensional drawing.
Tension-free mounting of the pump
¾
Balance unevenness with suitable supports.
•
Applies to mounting on foundations/load-bearing elements.
•
Total areas of all pump bearing areas are resting on the surface.
Correct position of the drives
•
All drives are set up ready for operation and mounted.
•
Correct displacements of the drive during transport/installation of the pump by adjusting/fix-
ing the drive.
CAUTION
Pump falling over.
Slight injury or damage to property can occur.
¾
Adhere to the lifting tool’s starting point.
¾
Pay attention to the dimensions, weight and centre of gravity of the pump.
¾
Use suitable mounting tools/lifting gear.
¾
Refer to the dimensional drawing.
CAUTION
Safety protection equipment.
Slight injury or damage to property may result.
¾
Connect safety protection equipment and activate.
Содержание BCSO 025-24 to 130-6L
Страница 2: ......
Страница 6: ......
Страница 12: ...6 ...
Страница 14: ...8 ...
Страница 20: ...14 ...
Страница 32: ...26 ...
Страница 44: ...38 ...
Страница 46: ...40 ...
Страница 48: ...42 ...
Страница 52: ...46 ...
Страница 54: ...48 ...
Страница 56: ...50 ...
Страница 58: ...52 ...
Страница 59: ...53 ...