Step 34 — Identification of Tower Locations
This image of the Lower Assembly
will assist you in identifying the X Y
& Z tower locations for correct
installation.
This image shows the base
assembly upside down, as it
would appear when preparing for
installation.
Step 35 — Bottom Installation
Route the Z tower wires through the opening in the Z tower location on the bottom assembly.
Make sure all wires are in the channel without pinching, as you did when installing the top wires.
Assembling Artemis 300
© 2018
seemecnc.dozuki.com/
Page 27 of 40