16
|
MAINTENANCE
RESIDENTIAL MAINTENANCE SCHEDULE
REQUIREMENTS FOR ALL COOLERS (EVERY 2 YEARS)
Maintenance Schedule servicing should be performed before the summer season. We require that the following components and the
operation thereof, be inspected after the first year of use, and serviced every 2 years for residential purpose.
COMPONENT CHECKS
Service Year
Service Item
Action
1
2
3
4
5
6
7
Pad Frames
Check
Clean (if required)
Tank
Check
Clean (if required)
Chillcel Pads
Check
Clean (if required)
Replace (if required)
Pad Pins & Washers
Check / Adjust
Clean (if required)
Water Distributors & Hoses
Check / Adjust
Clean (if required)
Pump
Clean Filter
Check Operation
Replace (if required)
Drain Valve (if fitted)
Clean
Check Operation / Adjust
Replace (if required)
Bleed Funnel (if fitted)
Clean
Check Operation
Solenoid
Check Operation
Replace (if required)
Probe
Clean
Check Operation
Replace (if required)
Float Valve
Check Operation / Adjust
Replace (if required)
Motor
Check Operation
Replace (if required)
Fan
Check / Adjust
Replace (if required)
Electronics Box & Cables
Check / Adjust
Replace (if required)
General Product Condition
Check condition and correct fitting of all components.
Adjust / replace as required.