background image

9

SEELEY INTERNATIONAL –

OWNER’S MANUAL

®

CPL LCB BM Evaporative Cooler

®

SERVICE

“SERVICE”

immediately on power

up indicates

communications needs

to be established

Push & hold the

button for at

least 10 seconds until

the word

disappears

“DOWN”

“SERVICE”

10

PROBLEM – Unpleasant Odour

CAUSE

ACTION

1.

Odour from new pads.

Allow time to condition by running the air
cooler. Drain the water, then allow the tank to
re-fill.

PROBLEM – Inadequate Cooling

CAUSE

ACTION

1.

Dry pads.

Check water flow to pads.
Inspect fitment of distributor cap.
Check for blocked or kinked hose. If blocked,
dismantle, clean and flush or un-kink the hose.

2.

Insufficient exhaust openings for

conditioned air.

Ensure sufficient openings. Refer to chart on
Pg. 2

3.

Excessive ambient humidity
(See also Insufficient exhaust)

On days where the ambient humidity is high,

the cooler will not reduce the temperature as
much as on drier days.

If your wall control displays SERVICE or should you consider that your cooler requires service, contact
your local Dealer or the Service number on the back of this manual.

Note!

If on initial start up the word “Service” appears on the controller and by pushing the on/off button

nothing happens, then you will need to establish communication between the wall control and the
electronic controller. Simply push and hold the “DOWN” button for approx. 10 seconds or until the
word “Service” disappears. If by pushing the on/off button a number appears, contact your local
Dealer or the Service number on the back of this manual.

TROUBLE-SHOOTING GUIDE

ROUTINE MAINTENANCE SERVICE SCHEDULE CHECKLIST

Service Item

Check/adjust

Clean

Replace

1 2 3 4 5 1

Water Distribution System

Component Function

General Operation

Chillcel pads (replace as required)
Pad retaining washers / pins
Base / water reservoir
Pump filter basket
Water probes
Water distribution system
Washers, seals and O-rings (replace
as required)
Drain operation
Bleed rate set (where required)

Pump operation
Drain valve operation
Motor operation (set motor amps
where required)
Solenoid operation
Wall control operation

Water level set point
Water fill time
Water drain time
Water distribution across pads (no dry spots)
Airflow through system / outlets
General product condition

Service No

Service Date

Service Technician

Service Company

No 1

.....................

..........................................

........................................................

(includes correct fitting of all components and items -
replace as required)

2 3 4 5 1 2 3 4 5

No 2

.....................

..........................................

........................................................

No 3

.....................

..........................................

........................................................

No 4

.....................

..........................................

........................................................

No 5

.....................

..........................................

........................................................

Содержание BM1150

Страница 1: ...ILL1456 A English LCB CPL BM OWNER S MANUAL Evaporative Cooler ...

Страница 2: ... 1 CPL LCB BM Evaporative Cooler Introduction Wall Control Functions Drain Valve Bleed System Maintenance Service Checklist Troubleshooting 7 9 6 3 2 10 ...

Страница 3: ... for use by persons including children with reduced physical sensory or mental capabilities or lack of experience and knowledge unless they have been given supervision or instruction concerning use of the appliance by a person responsible for their safety Children should be supervised to ensure that they do not play with the appliance Effective cooling To provide efficient cooling or ventilation t...

Страница 4: ...eration it was in when last turned off If your air cooler has not been operated for a while then when you start it Pre Cool Cycle may sometimes flash on the display as shown This indicates that the water pump will operate to saturate the cooling pads for a few minutes before the fan is turned on This is to ensure that when the fan starts only cool air enters the building WALL CONTROL FUNCTIONS CPL...

Страница 5: ...the cooler turns off Press S or T to overide the automatic cooling level setting and adjust your room temperature To switch to Manual mode press AUTO until Man appears in the display In Manual mode the cooling level can be manually adjusted In Manual mode press to choose between circulating cool air or un cooled air When Cool is displayed fresh cool air will circulate into the building When Vent i...

Страница 6: ... and then press and then S or T to set the required fan speed 3 To set the time until the start press 4 Then press S or T to adjust the time The cooler can start up to 24 hours in advance 5 Press again to initiate the timed automatic start The timed start will not repeat You can also set the air cooler so that it will turn off after a set number of hours 1 To set a delayed stop time press with the...

Страница 7: ...ur air cooler WALL CONTROL FUNCTIONS cont This cooler comes with a continuous bleed system Coolair CPL Braemar BM or automatic Drain Valve standard for Braemar LCB optional for Coolair CPL and Braemar BM During operation the bleed system will drain small amounts of water This ensures fresh water is continually added to dilute salt accumulation in the water caused through evaporation This helps kee...

Страница 8: ...e is required However we require that the following components and the operation thereof be checked after the first year then every 2 years as routine maintenance 1 Pump 2 Drain Valve 3 Solenoid and associated filter 4 Fan motor operation and current 5 Float valve Routine maintenance may be required more frequently in adverse environmental situations or where the appliance is installed in non dome...

Страница 9: ...peat external inspections as per End of Season Service Remove the pad frames as shown Ensure the power switch in the cooler is off Gently wash the pads to remove any dust build up during the winter period If the pads are in poor condition replace them Inspect pad retention pins and washers for damage and that they are securely fitted Replace the bleed system if it was removed during previous maint...

Страница 10: ...s seals and O rings replace as required Drain operation Bleed rate set where required Pump operation Drain valve operation Motor operation set motor amps where required Solenoid operation Wall control operation Water level set point Water fill time Water drain time Water distribution across pads no dry spots Airflow through system outlets General product condition Service No Service Date Service T...

Страница 11: ...nt openings Refer to chart on Pg 2 3 Excessive ambient humidity See also Insufficient exhaust On days where the ambient humidity is high the cooler will not reduce the temperature as much as on drier days If your wall control displays SERVICE or should you consider that your cooler requires service contact your local Dealer or the Service number on the back of this manual Note If on initial start ...

Страница 12: ... improvement Accordingly specifications are subject to change without notice Please consult with your dealer to confirm the specifications of the model selected When you contact your Dealer regarding service or warranty please quote the cooler model number and serial number as shown below Warranty Service Australia 1 300 650 644 seeleyinternational com ...

Отзывы: