A
IRA
ATH I
NSTALLATION
O
PERATION AND
S
ERVICE
M
ANUAL
3.3 Clearance Data -U Tube
NOTE:
1. All dimensions are from the surfaces of all tubes, couplings, tees, elbows and crosses.
2. Clearances B, C and D can be reduced by 50% after 7500 mm of tubing downstream
from the burner.
3. All measurements are in millimeters.
4. Add 60 mm clearance to uncovered U-tube.
FIGURE 11: U-TUBE, HORIZONTAL MOUNT
A
B
D
C
M
od
el
ATH1
5U
T
ATH2
0U
T
ATH2
5U
T
ATH3
0U
T
ATH3
5U
T
ATH4
0U
T
ATH4
5U
T
ATH5
0U
T
A
150
150
150
150
150
150
200
200
B
890
970
970
1020
1170
1220
1270
1380
C
1580
1730
1730
1910
1980
2050
2110
2210
D
760
940
940
1000
1090
1150
1200
1300
FIGURE 12: U-TUBE, ONE SIDE REFLECTOR
A
B
D
C
M
od
el
ATH1
5U
T
ATH2
0U
T
ATH2
5U
T
ATH3
0U
T
ATH3
5U
T
ATH4
0U
T
ATH4
5U
T
ATH5
0U
T
A
150
150
150
150
150
150
200
200
B
230
230
230
230
230
230
230
230
C
1580
1760
1760
1930
2090
2130
2160
2240
D
1200
1380
1380
1500
1660
1710
1760
1860
FIGURE 13: U-TUBE, TWO SIDE REFLECTORS
A
B
D
C
M
od
el
ATH1
5U
T
ATH2
0U
T
ATH2
5U
T
ATH3
0U
T
ATH3
5U
T
ATH4
0U
T
ATH4
5U
T
ATH5
0U
T
A
150
150
150
150
150
150
200
200
B
590
640
640
690
820
860
890
1020
C
1660
1810
1810
1960
2110
2160
2210
2320
D
590
640
640
690
820
860
890
1020
FIGURE 14: U-TUBE, FULL 45° MOUNT
B
A
C
D
M
od
el
ATH1
5U
T
ATH2
0U
T
ATH2
5U
T
ATH3
0U
T
ATH3
5U
T
ATH4
0U
T
ATH4
5U
T
ATH5
0U
T
A
200
200
200
200
200
200
200
200
B
200
200
200
200
200
200
200
200
C
1500
1650
1650
1860
1960
2040
2110
2160
D
1070
1170
1170
1320
1550
1620
1680
1780
8 of 73