
manual of horse blanket drying rack
12
4.2 Exploded-view & parts list of four-fold drying rack
N.B.
Always check the delivery slip of the delivered parts well for quantity and quality. Any visible
defects need to be indicated within 7 days after delivery in writing.
NO.
Description
Quantity
01
Composition of switch block
1
01A
Switch block
1
01B
PCB printed board 1
1
01C
PCB printed board 2
1
01D
Foot switch
4
01E
M3 screws
10
01F
M6 washer
4
01G
M6x20 Allen screws
4
02
Foot
1
03
Plug (option)
4
04
M8 coach screw (option)
4
05
Conical recording pin
4
06
End plug
2
07
Hinge
4
08
Lock pin
4
09
Adjusting bolt
4
10
Drying rack (pipe radiator)
4
11
Clamp for backrest part
4
12
Clamp for chestpiece blanket
4
13
Grip
4
14
Grip
4
15
End cap
8
16
Automatic air vent
4
17
Heating element
4
18
IEC plug
4
19
Filler cap
4
20
IEC plug
1
21
Earthed Schuko plug EU or
U.S.
1
11
10
15
08
07
09
01G
04
02
03
01F
12
01
20
21
18
17
19
15
14
16
13
01E
01A
01C
01D
01B
06
05