step 6
Work the elevator up and down some times to work the hinges and check for proper movement.
step 7
Repeat steps 2 through 6 for the remaining stabilizer.
step 8 (LEFT side)
Locate the following items, included in the hardware pack of the “OPTIONAL 3D ELEVATOR”.
step 8
With the hobby knife remove the cover in the control horn location. Place the fibreglass control
horn into elevator, check for correct alignment and glue it with some drops of medium CA.
21
Содержание Wind S 110 ARF
Страница 2: ......